Loading...
Raintree Vill/FP-CS 850508Be Date: 5-8-85 Rev. No: 0 DEVELOPMENT IMPACT ANALYSIS Raintree Village General 1. Development Name and size: 30.612 acres 2. Owner: Ken E. Marchant Custom Homes, Inc. 3. Engineer: Nelson Engineering 4. Current zoning: SF 5. Current status of development: Final Plat 6. Location: SE corner MacArthur Blvd. and DeForest 7. Proposed density: 6 lots/acre 8. Annexation or land study required: N/A 9. Issues resolved: N/A 10. Issues to be resolved: Screening walls @ DeForest, drainage to east 11. Dedications required: 10' at DeForest Impact 1. Traffic: a. Off-site collector streets: N/A b. Off-site arterial streets: MacArthur Blvd. - 1800 vpd 2. Sewer: a. Proposed mains: 1 b. Proposed connections to existing mains: Exist. 8" @ MacArthur 3. Water: Exist. 12" at MacArthur 4. Drainage or Flow: to north and east 5. Schools: a. Primary school: 120 students b. Middle school: 60 students C. Approvals and Fees Fees: Final Plat Water Availability Fee Sewer Availability Fee Construction Permit Fee Parks Fees Required {W~D~$e ui~ ..... ~Did .to date° $92,000.00 92,000.00 31,377.00 27,600.00 2. Assessments and Pro Rata Charges: Item: DeForest Road Summary: 1422' x $75/ft. = $106,650.00 Item: Street Signs Summary: 13 x $143.75 = $!869.00 Item: Street Lights Summary: 26 x $261.00 = $6~786. O0 Approvals a. Annexation b. Land study: P&Z, City Council c. Zoning: P&Z, City Council d. Preliminary Plat: City Engineer: Planning & Zoning: City Council: e. Final Plat City Manager: City Engineer: Planning & Zoning: City Council f. Construction Plans: City Manager: City Engineer: g. File approved plat: h. Letter of acceptance: i. Receive as-builts: j. End of warranty period: