Raintree Vill/FP-CS 850508Be
Date: 5-8-85
Rev. No: 0
DEVELOPMENT IMPACT ANALYSIS
Raintree Village
General
1. Development Name and size: 30.612 acres
2. Owner: Ken E. Marchant Custom Homes, Inc.
3. Engineer: Nelson Engineering
4. Current zoning: SF
5. Current status of development: Final Plat
6. Location: SE corner MacArthur Blvd. and DeForest
7. Proposed density: 6 lots/acre
8. Annexation or land study required: N/A
9. Issues resolved: N/A
10. Issues to be resolved: Screening walls @ DeForest, drainage to east
11. Dedications required: 10' at DeForest
Impact
1. Traffic:
a. Off-site collector streets: N/A
b. Off-site arterial streets: MacArthur Blvd. - 1800 vpd
2. Sewer:
a. Proposed mains: 1
b. Proposed connections to existing mains: Exist. 8" @ MacArthur
3. Water: Exist. 12" at MacArthur
4. Drainage or Flow: to north and east
5. Schools:
a. Primary school: 120 students
b. Middle school: 60 students
C. Approvals and Fees
Fees:
Final Plat
Water Availability Fee
Sewer Availability Fee
Construction Permit Fee
Parks
Fees Required
{W~D~$e ui~ ..... ~Did .to date°
$92,000.00
92,000.00
31,377.00
27,600.00
2. Assessments and Pro Rata Charges:
Item: DeForest Road
Summary: 1422' x $75/ft.
= $106,650.00
Item: Street Signs
Summary: 13 x $143.75
= $!869.00
Item: Street Lights
Summary: 26 x $261.00
= $6~786. O0
Approvals
a. Annexation
b. Land study: P&Z, City Council
c. Zoning: P&Z, City Council
d. Preliminary Plat:
City Engineer:
Planning & Zoning:
City Council:
e. Final Plat
City Manager:
City Engineer:
Planning & Zoning:
City Council
f. Construction Plans:
City Manager:
City Engineer:
g. File approved plat:
h. Letter of acceptance:
i. Receive as-builts:
j. End of warranty period: