Nlake WE P10C/FP-CS 941103TIPTON ENGINEERING, INC.
ENGINEERING · SURVEYING · PLANNING 4026
6330 Belt Line Road · SuiteC · Garland, Texas 75043 ° (214) 226-2967 · FAX 226-1946
November 3, 1994
Mr. Gary Sieb
Director of Planning
CITY OF COPPELL
255 Parkway Boulevard
Coppell, Texas 75019
NORTHLAKE WOODLANDS EAST NO. 10, PHASE C, FINAL PLAT
COPPELL, TEXAS
Dear Mr. Sieb:
Please fred listed below the responses to the Development Review Committee meeting which was
held on October 27, 1994:
PLANNING DEPARTMENT COMMENTS:
We have labeled the dotted line on the plat showing
TP&L Easement.
Under Variances, we have reworded thc statement
to read "Landscape Areas to be maintained by the
Homeowners Association."
BUILDING INSPECTION COMMENTS:
1. We have revised all fence setbacks.
FIRE DEPARTMENT COMMENTS:
1. We are providing new street names.
Mr. Gary Sieb
November 3, 1994
Page No. 2
TU ELECTRIC COMMENTS:
1. We are still waiting for final utility easements.
Fo
ENGINEERING COMMENTS - FINAL PLAT:
We have shown the correct visibility easement at
the intersection of Bethel School with MacArthur
Boulevard.
We have labeled the existing drainage easement
adjacent to Lot 36, Block H. We have also
provided the volume and page number.
We have reevaluated Lots 28-30 to provide an
easement for the Irving Water Line.
This concludes our review of staff comments. If you have any questions or if we can furnish
additional information, do not hesitate to contact our office.
~INEERING, INC.
President
PA:ea
Attachments