Loading...
River Ridge/Re-DR 940929 (3)I I TU ELECTRIC Comments for the City of Coppell Development Review Committee Preliminary/ Final~ Plat for Date 9-29-94 /p~~~~~~' - ~s ~- acceptable. Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined. Other comments Please call me at 214-888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234