River Ridge/Re-DR 940929 (3)I I
TU ELECTRIC
Comments for the City of Coppell
Development Review Committee
Preliminary/ Final~ Plat for
Date 9-29-94
/p~~~~~~' - ~s ~- acceptable.
Easements will be required for proposed electric facilities.
A plat with easement requirements will be provided to the
developer.
Load information (size of structure, A/C / Heat Load) will
be required from the developer before easements can be
determined.
Other comments
Please call me at 214-888-1307 if you have any questions.
Tim Brancheau
14400 Josey Lane Farmers Branch, Texas 75234