Riverchase-2/FP-CS 880329COPPELL PUBLIC WORKS
MEMORANDUM
March 29, ~988
TO:
FROM:
RE:
Planning & Zoning Department
Public Works Administration
Riverchase Clubhouse Addition
Attached are the comments and fee assessments associated with the
above referenced development, which staff believes are applicable.
If there are any questions and/or comments regarding this matter,
please direct those inquiries to the following departments that
are affected. Thank you.
Public Works Administration
Steve Goram
Steven Morton
Water Utilities
Howard Pafford
Parks
Richard Diano
Streets - Signs/Signalization
Per Birdsall
Dana Kamp
SGG/sm
Attachments
COPPELL PUBLIC WORKS
MEMORANDUM
March 28, 1988
TO:
FROM:
RE:
Taryon Bowman, Planning & Zoning Coordinator
Steve Morton, Chief Public Works Inspector
Riverchase Clubhouse Addition
Preliminary Final Plat
After reviewing the above referenced item with Public Works
Supervisors, please find below items which will need to be resolved
prior to final plat acceptance:
Install 8" meter vault and double check valve as per standard
specification SD18
Paving Specification
Subgrade Specifications
Grade and Drainage Plans
Show distance to closest intersection (property fairway)
Estimated square footage of Clubhouse
This is an irregular procedure in reference to submitting
preliminary/final plan jointly. Since this is a private subdivision,
I have no problem with it moving forward as long as all
aforementioned items are addressed prior to the approval of
construction plans and issuance of construction permit.
Note: I will need the estimated square footage of clubhouse as
soon as possible before fees can be calculated as they are calculated
by square footage for commercial and retail.
SMM/sm
CC:
Keith Bailey, Architect
Steve Goram, Director of Public Works
Richard Diano, Park Foreman
Per Birdsall, Street Foreman
Howard Pafford, Water Foreman
/~_~-") The City With A Beautiful Future
P.O. Box 478
Coppell, Texas 75019
214 - 462 - 0022
March 29, 1988
Mr. Ken James
American Golf
P.O. Box 157609
Irving, Texas 75015-7609
RE: Rivercbase Clubhouse Addition
Below you will find the fee assessments for the above referenced
project:
Water Availability Fee:
$60.00/ 1000 sf (bldg.) = $282.84 (50% due at
final plat)
$282.84 (50% due at
bldg. permit)
Sewer Availability Fee:
$60.00/ 1000 sf (bldg.) = $282.84 (50% due at
final plat)
$282.84 (50% due at
bldg. permit)
Water Tap Fee: Installed with construction of Riverchase Drive
Construction Permit Fee:
Assessable at preconstruction meeting
1.5% construction cost within city R.O.W.
and Easement
PaYk Fee:
SL-reet Light Fee:
Street Sign Fee:
N/A
N/A
N/A
If you have any questions, please feel free to call my office at
462-8495.
Sincerely,
Steven M.
Public Works Inspector
SMM/sm
cc:
Steve Goram, Director of Public Works
Per Birdsall, Street Foreman
Richard Diano, Park Foreman
Howard Pafford, Water Foreman
Taryon Bowman, Planning & Zoning Coordinator