Gatew-2.3/MP-DR 980326 (2)II,ELECTRIC
Comments for the City of Coppell
Development Review Committee
Preliminary/Final Plat for
Date '~ - 2-(~d~//
__Preliminary/Final Plat is not acceptable.
__Easements will be required for proposed electric/gas facilities. A plat with
easement requirements will be provided to the developer.
__Load information (size of structure, A/C, heat load) will be required from the
Jo eVeloper before easements can be determined.
ther comments .,. _
Please call me at 972/888-1307 if you have any questions.
Tim Brancheau
14400 Josey Lane Farmers Branch, Texas 75234