Loading...
Riverside Ch/SPAm-AG000509~T~e City Wlth--~Beau CITY COUNCIL MEETING: AGENDA REQUEST FORM May 9, 2000 ITEM # __~ ITEM CAPTION: SUBMITTED ~'Y: O~yL_~Si_j_eh_~~ TITLE: .... ]~or of Planning and Community Services STAFF COMMENTS: Consider approval of the Riverside Church of Christ, Site Plan Amendment, to allow the construction of a two-story addition to the existing church and additional parking spaces on 6.5 acres of property located at 150 E. Beltline Road. APPROVEO CouNCIL Date of P&Z Meeting: April 20, 2000 Decision of P&Z Commission: Approved (6-0) with Commissioners Halsey and Stewart voting in favor. None opposed. Nesbit, McGahey, Kittrell Clark, Approval recommended, subject to the following condition: ~-'~e property being replatted to relocate utility easements and delineate fire lanes. Staff recommends approval. DIR. INITIALS: ,~, FIN. REVIEW:L~ Agenda Request Form -'Revised 2/99 CITY MANAGER REVIEW: Document Name: ~RCCsp CASE: CITY OF COPPF:J PLANNING DEPARTMENT STAFF REPORT RIVERSIDE CHURCH OF CHRIST SITE PLAN AMENDMENT P & Z HEARING DATE: C.C. ]-IEARING DATE: April 20, 2000 May 9, 2000 LOCATION: 150 Beltline Road. SIZE OF AREA: Approximately 6.5 acres of property. CURRENT ZONING: C (Commercial) and LI (Light Industrial) Site Plan approval. APPLICANT: Applicant: Aubrey Hallum Hallum Architects, Inc 2501 Parkview Drive, Suite 430 Fort Worth, Texas 76102 817-332-2422 FAX: 817-338-1949 HISTORY: TRANSPORTATION: In 1993 the City Council approved a Site Plan and Final Plat for this property, subject to the escrow fee for improvements to Beltline Road being waived. The original site plan included a 23,143 square foot, two story church with 244 parking spaces. The lot coverage was less than 5%. The remaining land was being devoted to playground, parking, circulation, and landscaping. Beltline Road serves the subject site along the southern border and Northlake Drive along the eastern border. Beltline Road at this location is presently a substandard 2-lane asphalt roadway. Future Item # 15 plans call for a six-lane divided thoroughfare (P6D). North Lake Road has 37 feet of pavement, within 60' of right-of-way. SURROUNDING LAND USE & ZONING: North- Mini-warehouses; LI, Light Industrial zoning South - Northlake Power Plant East - Light manufacturing; LI, Light Industrial zoning West -Light manufacturing; LI, Light Industrial zoning COMPRF_I-IENSIVE PLAN: The Comprehensive Plan shows the property as suitable for fight industrial uses. DISCUSSION: The current request is to amend the site plan to expand the existing 23,335 square foot church by 24,556 square feet, more than doubling it's current size to 47,891 square feet. The site plan also indicates a future expansion area of a two story classroom structure. The current plans also include the erection of a 47'-4" white, prefabricated, fiberglass spire on the existing two story building for an overall height of 102 feet. Per the Zoning Ordinance, parking for church use is based on one space per three seats in the main auditorium, and addition parking for the ancillary uses as determined by the building official. There are currently 241 spaces, 47 spaces will be removed to accommodate this phase of development, and an additional 122 spaces will be added, for a total of 316 parking spaces. Future plans call for an additional 79 spaces adjacent to the north property line for a grand total of 395 spaces. The elevations indicate the use of the same materials on the expansion as exists on the existing structure, face brick and composition shingle roof. Covered drop off areas are planned on the north and south ends of the new addition. Approximately 36% of the property is devoted to landscaping. There are 54 existing red oak trees on the property, 6 of which will be removed for this expansion. The original plan indicated a significant amount of land along the Denton Tap Road frontage being devoted to landscaping and walkways. This expansion includes an addition of 52 parking spaces in this area, with approximately 44,500 square feet of landscaping (non- vehicular) remaining. This exceeds the non-vehicular requirement by over 7,700 square feet. Perimeter landscaping is being provided along all property boundaries. Ten feet is being provided along the north and west property lines and 30 feet along the south and east property lines. Item # 15 In terms of interior landscaping, landscaped islands are provided with a maximum separation of 15 parking spaces, with 3 inch caliper trees in every island. This property was originally platted in 1993, with setback lines and various utility easements. A replat of this lot will be required prior to the issuance of a building permit for this expansion. The proposed expansion will require the relocation of existing utilities and their associated easements. The fire lanes will also be platted with this replat. RECOM3~NDATION TO THE PLANNING AND ZONING COMMISSION: Approval of the Site Plan for the Riverside Church of Christ subject to; (1) The property being re-platted. ALTERNATIVES: 1) Recommend approval of the request. 2) Recommend disapproval of the request 3) Recommend modification of the request 4) Take under advisement for reconsideration at a later date. ATTACHMENTS: 1) 2) 3) 4) Site Plan Landscape Plan Floor Plan Elevations Item # 15 i Jl ~2 Ii==i-