Loading...
PD-186R4-AG020514· r H E C ! 3' ¥ · 0 F COPP-ELE AGENDA REQUEST FORM CITY COUNCIL MEETING: May 14, 2002 ITEM # 16 ITEM CAPTION: SUBMITrED BY: TITLE: PUBLIC HEARING: Consider approval of Case No. PD-186R4, Duke-Freeport, zoning change request from PD-186R2 (Planned Development-186R2) to PD-186R4 (Planned Development-186R4) to attach a Detail Site Plan to allow the construction of an approximate 160,000 square-foot building (Building 4) and to reduce the required parking on approximately 11.8 acres of property located along the west side of Freeport Parkway, north of Bethel Road. APPROVED BY Motion to close Public CITY COUNCIL Hearing and Approve E, · ----. M- York Gary L. SiebON ABOVE DAT /~e:'J. o.,~ Director of Planning and Community Services .... J" - ...... STAFF COMMENTS: Jvote - 6-0 ! Date of P&Z Meetimz: April 18, 2002 Decision of P&Z Commission: Approved (6-0) with Commissioners McCaffrey, Clark, Kittrell, Halsey, Dragon and Stewart voting in favor. None opposed. Approval is recommended, subject to the following conditions: (CONDITION MET) Staff recommends approval. DIR. INITIALS: ~ Agenda R~quest Form- ~ 5/00 CITY MANAGER REVIEW.=. @ 2PD 186R4 Duke-Freeportl-Agenda Request CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE NO.: PD-186R4 Duke-Freeport P & Z HEARING DATE: C.C. HEARING DATE: STAFF REP.: LOCATION: SIZE OF AREA: April 18, 2002 May 14, 2002 Mareie Diamond, Assistant Planning Director Along the west side of Freeport Parkway, north of Bethel Road. Approximately 11.8 acres of property. CURRENT ZONING: PD-186R2 (Planned Development-186R2) REQUEST: PD-186R4 (Planned Development-186R4) for a Detail Site Plan approval for a 159,000 square-foot building. APPLICANT: Applicant: Paul Brown Duke Realty Corporation 5495 Beltline Road, Suite 360 Dallas, Texas 75254 972-361-6714 FAX: 972-361-6800 HISTORY: On September 12, 2000, City Council approved a Conceptual Planned Development District (PD-186-LI) for industrial uses to allow the development of seven offieegwarehouse facilities on approximately 143 acres of property. Also approved was a final plat for this property to allow the construction of the extension of Freeport Parkway from Bethel Road to Ruby Road. Page 1 of 5 Item #6 On January 9, 2001, City Council approved a Detail Plan for Tracts 4 and 4x of this PD. Part of this approval was a condition to prepare a tree mitigation plan for this PD. In October 2001, City Council approved a reduction of parking required for warehouse uses on Tract 1 from one space per 1,000- square feet to one space per 5,000-square feet, allowed for additional monument signage, and attached a tree reparation/landscape plan to the PD. TRANSPORTATION: The construction of Freeport Parkway is complete through this property as a C4D/6 four-lane divided thoroughfare built in a six- lane (120- foot) 1LO.W. Bethel Road is proposed to be a C4D, (four-lane divided street within a 11 O-foot R.O.W) west of Freeport Parkway. East of Freeport Parkway, Bethel Road is a C2U, two-lane undivided roadway within 50 feet of right-of-way. SURROUNDING LAND USE & ZONING: North- vacant land; PD 186R2-LI South - Minyards; LI (Light Industrial) East - Light Industrial building; PD 186R (Tracts 4 and 4x) West - vacant; PD-185-LI (Light Industrial) Tradepoint COMPREHENSIVE PLAN: The Comprehensive Plan shows the property as suitable for office, showroom, light industrial and warehousing uses. DISCUSSION: This request is for approval of a Detail Site Plan to allow the development of a 159,224 square-foot building to house a regional distribution center for ULINE, which is a distributor of shipping supplies. There are six existing ULINE facilities -- five are located in the United States and one in Mexico. SITE PLAN The site plan includes phaSe One of this development as described above, with a potential expansion area of an additional 70,845-square feet. Similar to the previous requests by Duke Realty Corporation, this Detail Site Plan approval includes a request to reduce the number of parking spaces provided for this development. As currently proposed, 82 parking spaces are being provided, based on a ratio of one space per 300-square feet for the office (50 spaces) and one space per 5 0_5.,_Q9~00 square feet for the warehouse (32 spaces). The applicant has stated that this user will initially have 55 employees. The maximum number of employees within this phase is projected to be 30 in the warehouse and 50 in the office. Therefore ULINE's employees could be accommodated with this reduced parking ratio. However, in the event that the demand for parking escalates due to an increase of ULINE employees, or a new tenant/owner occupies Item #6 Page 2 of 5 this building in the future, assurances are required that parking for warehouse under the one space per 1,000-square feet requirement can be provided. The applicant has provided a build-out scenario, with ULINE at ultimate development (229,214-square feet) and parking provided per our current standard. Under these two conditions, 265 parking spaces would be required. The applicant has indicated, in dashed lines, the additional parking that would be required. However there are inconsistencies on the site plan exhibit, whereas 186 additional parking spaces would be required, only 162 additional are indicated on the site plan; and 177 additional parking spaces are shown on the Data Table. It appears that 24 additional parking spaces would be required to fulfill the 1/1000 parking requirement at full build-out. There is also a minor inconsistency with the proposed screening' wall adjacent to the north side of the track court. On the site plan, it is called out to be 14 feet by 60 feet. However, on the elevations, this wall is dimensioned and measures only 10 feet in height. This also needs to be remedied. Page 3 of 5 LANDSCAPE PLAN The detailed landscape plan is based on the first phase of development with the parking reduced to 82 spaces. Approximately 42% of the property will be devoted to landscaping during this first phase of construction. The frontage along Freeport Parkway will be enhanced with a combination of open space/ground cover areas, existing trees and proposed Bald Cypress, Live Oaks and Chinese Pistache trees. Along the southem property line, adjacent to a drainage area (water feature) in lieu of a landscape hedge, a combination of over-story and ornamental trees is being proposed. The notes on the landscape plan call out a curb and wall along this property line. It is assumed that this wall is a below~grade retaining wall for the drainage area; however, this needs to be verified. Along the west property line, a 36-inch berm will be installed with the adjacent building (Building 3), with 19 Cedar Elms along this common property line. There is a minor technical issue with this Landscape Plan. There are inconsistencies in the actual tree count on the plan, in the Landscape Tabulations table and the Plant List. These need to be resolved prior to City Council consideration of this request. A Conceptual Landscape Plan (Alt L1.01) was also submitted to assure that the required amount of landscape areas could be provided at full build-out and meet our parking requirements. It appears that given the Item #6 Page 4 of 5 irregular shape of the property, some overage exists in the provision of landscaped area, especially non-vehicular landscaping. Under this build- out scenario, approximately 18% of the property is devoted to landscaping. In the event that the additional 24 parking spaces are provided, there should be sufficient landscaping remaining. ELEVATIONS The main portion of this approximate 160,000 square-foot structure will be a standard painted tilt-wall industrial building, with the main color being cream with dark green accent bands located at 25 feet and along the roof line of the main structure. The actual truck courts will be screened with a 14- foot masonry wall running parallel to Freeport Parkway. Eastern Red Cedars will soften the appearance of this wall from Freeport Parkway. There are several concerns with the proposed elevations of this building. Recently, a text amendment to the Zoning Ordinance was approved regulating the appearance of industrial buildings based on the recommendations of the C.I.V.I.C. Report. SpecifiCally, the following wording has been added to the Zoning Ordinance: Exterior wall surfaces should consist of no more than three earthen colors. The base color may be utilized on up to 80% of the surface area of any one faqade of a building..~n accent color may be used on up to 1% of the surface area of any one faqade. For calculation purposes, wall surfaces should include eaves, gables and parapets, but should exclude roofs, awnings or signs. Y?here walls exceed 100 feet in length, additional architectural accents must be included to break up the expanse of the wall. These may include items such as reveals, windows, and wall articulations, among others. The elevations, as submitted, do not comply with these regulations in that the accent color (green) appears to be greater than 1% of the surface area of any one facade, and that the base color exceeds the 80% threshold. Another earth tone color should be added to meet these requirements. Second, the walls exceed 100 feet in length, therefore additional architectural accents needed to be added to break up the expanse of the wall. This is especially critical along the north and south elevations of the buildings. Finally, there is a concem with the 15,000 square-foot office portion of the building on Freeport Parkway. This portion will project from the front building wall and will have a dark green standing seam metal roof. While this roofing style is encouraged in our retail and town center areas, it is not typical in the industrial areas. The proposed tenant for this building, ULINE, is requesting this architectural style to be in keeping with their Item #6 corporate image of three of their five existing U.S. distribution centers. However, staff would suggest an alternative roofing style for this building, such as a parapet wall. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff is recommending APPROVAL of PD- 186R4, subject to the following conditions: 1. Rectify the inconsistencies in the parking counts on the site plan for the build-out scenario. 2. Provide a 14-foot tall screening wall adjacent to the track court. 3. Verify that the wall along the south property line is a below-grade retaining wall adjacent to the drainage area. 4. Verify the height of the screening wall adjacent to the track court. 5. Revise elevations to be in accordance w/th Ordinance No. 91500-A-319 6. Consider alternative roofing style for the office portion of the building. ALTERNATIVES: 1) Recommend approval of the request. 2) Recommend disapproval of the request 3) Recommend modification of the request 4) Take under advisement for reconsideration at a later date. ATTACHMENTS: 1) 2) 3) 4) 5) Engineering comments Site Plan Landscape Plan Landscape Plan (build-out Alt. A) Elevations Page 5 of 5 Item #6