St Ann Church/FP-CS 880517 PAUL S. UNZICKER, INC.
CONSULTING ENGINEERS
8700 STEMMONS FREEWAY, SUITE 400
DALLAS, TEXAS 75247
¢214) 634-3300
May 17, 1988
Mr. Steve Morton
Chief of Land Development
Public Works Dept.
City of Coppell
732 Deforest Road
P.O. Box 478
Coppell, Texas 75019
Re:
Saint Ann Catholic Church
Water Pro-Rata
87085-0
Dear Steve:
Enclosed please find one copy of the Revised Final Plat, one copy of the
approved Water and Sanitary Sewer Plan (sheet 3 of 8) and one copy of the legal
description for that portion of Proposed Woodmoor Drive Right-of-Way and
utility easement which corresponds with the 8" water main and appurtenances to
be installed by Saint Ann Catholic Church along the Church's North property
line.
As discussed by telephone earlier today, the linear footage of 8" water main
along the proposed South Right-of-Way of. Woodmoor Drive is 402.03 feet. The
cost for installing this main including the tap to the existing 12" water main
in Samuel Boulevard and the 6" water main extention and fire hydrant is
$15,882.00 as provided in a letter from Hall and Nelms, Inc. dated 2-23-88. A
copy is enclosed. Therefore, the cost per linear foot is $39.50.
If you need additional information or have any questions, please call.
Sincerely,
Jodie S. Kelly
Project Engineer
cc:
Ms. Taryon Bowman / City of Coppell
Father Killian Broderick / St. Ann Catholic Church
Mr. Otto Marinick / Beran and Shelmire Architects
PAUL S. UNZICKER, P.E.
President
DAVID M. SCHNURBUSCH, P.E.
Vice President