Loading...
St Ann Church/FP-CS 880517 PAUL S. UNZICKER, INC. CONSULTING ENGINEERS 8700 STEMMONS FREEWAY, SUITE 400 DALLAS, TEXAS 75247 ¢214) 634-3300 May 17, 1988 Mr. Steve Morton Chief of Land Development Public Works Dept. City of Coppell 732 Deforest Road P.O. Box 478 Coppell, Texas 75019 Re: Saint Ann Catholic Church Water Pro-Rata 87085-0 Dear Steve: Enclosed please find one copy of the Revised Final Plat, one copy of the approved Water and Sanitary Sewer Plan (sheet 3 of 8) and one copy of the legal description for that portion of Proposed Woodmoor Drive Right-of-Way and utility easement which corresponds with the 8" water main and appurtenances to be installed by Saint Ann Catholic Church along the Church's North property line. As discussed by telephone earlier today, the linear footage of 8" water main along the proposed South Right-of-Way of. Woodmoor Drive is 402.03 feet. The cost for installing this main including the tap to the existing 12" water main in Samuel Boulevard and the 6" water main extention and fire hydrant is $15,882.00 as provided in a letter from Hall and Nelms, Inc. dated 2-23-88. A copy is enclosed. Therefore, the cost per linear foot is $39.50. If you need additional information or have any questions, please call. Sincerely, Jodie S. Kelly Project Engineer cc: Ms. Taryon Bowman / City of Coppell Father Killian Broderick / St. Ann Catholic Church Mr. Otto Marinick / Beran and Shelmire Architects PAUL S. UNZICKER, P.E. President DAVID M. SCHNURBUSCH, P.E. Vice President