St Ann Church/Re2-DR 961226 (4)SENT BY:TU FARr~IERS BRANCH ;12-20-~6 ; 14:88 ; TU FARMERS BRANCH-. 214 804 8~70;# 4/ 6
I'IIEI FC TRIC
Comments for the city of Coppell
Development Review Committee
Date
Dr ........... ,/Z2---~ is not acceptable.
Easements will be required for proposed electr]G faci:lities.
A plat witlt easement requirements will be provided to the
developer.
Load information (size of structure, A/C / lleat Load) will
be required from the developer before easement~ can be
determined.
Please call me at~:~888-1307 if you have any questions.
Tim Brancheau
144~J0 Jrtncy l.,,U~ Fwu4~ BranQh. 'Fex~