Loading...
Sandy L Add(1)/PP-DR 901025 (2) GINN, INC. DRC REVIEW COMMENTS FOR 10/25/90 AND 11/1/90 DRC MEETINGS PD-114 - Riverchase 48.08 acres 1. 15' R.O.W. Dedication required on Sandy Lake Road (future 110' R.O.W.) 2. What are their intentions for the existing open drainage channel? 3. Escrow of $200/FF will be required on Sandy Lake Road for future improvements. S-1049(A) Site Plan Alteration: 1. Provide 10' Drainage Easement along west property line for future storm sewer serving Sandy Lake Road and adjacent sites. 2. Provide copy of executed easements or deed for driveway to Samuel Blvd. 8-1050 - S.U.P. for temporary concrete batch plant 1. How is site drainage going to be handled? Sandy Lake Addition - Preliminary Plat 1. Same as Item No. 1 for S-1049(A) above 2. Same as Item No. 2 for S-1049(A) above 3. Drainage use TP/40 for computations 6k runoff as per Subdivision Ordinance 4.Escrow funds for fut and¥ ake Road Improvements ($200/FF x 259.02 FF ~~ Devonshire Addition Preliminary Plat: 1. Escrow required for future improvement of Coppell Road ($100/FF x 729.90 FF = $72,990.00) Preliminary Water and Sewer Layout: 1. Sanitary Sewer must go to the Cottonwood Branch Interceptor. Existence of line in Coppell Road is in question. Preliminary Drainage: 1. Discharging storm sewers onto residential lots will not be allowed.