Sandy L Add(1)/PP-DR 901025 (2) GINN, INC. DRC REVIEW COMMENTS
FOR 10/25/90 AND 11/1/90 DRC MEETINGS
PD-114 - Riverchase 48.08 acres
1. 15' R.O.W. Dedication required on Sandy Lake Road (future
110' R.O.W.)
2. What are their intentions for the existing open drainage
channel?
3. Escrow of $200/FF will be required on Sandy Lake Road for
future improvements.
S-1049(A) Site Plan Alteration:
1. Provide 10' Drainage Easement along west property line for
future storm sewer serving Sandy Lake Road and adjacent
sites.
2. Provide copy of executed easements or deed for driveway to
Samuel Blvd.
8-1050 - S.U.P. for temporary concrete batch plant
1. How is site drainage going to be handled?
Sandy Lake Addition - Preliminary Plat
1. Same as Item No. 1 for S-1049(A) above
2. Same as Item No. 2 for S-1049(A) above
3. Drainage use TP/40 for computations 6k runoff as per
Subdivision Ordinance
4.Escrow funds for fut and¥ ake
Road
Improvements
($200/FF x 259.02 FF ~~
Devonshire Addition
Preliminary Plat:
1. Escrow required for future improvement of Coppell Road
($100/FF x 729.90 FF = $72,990.00)
Preliminary Water and Sewer Layout:
1. Sanitary Sewer must go to the Cottonwood Branch Interceptor.
Existence of line in Coppell Road is in question.
Preliminary Drainage:
1. Discharging storm sewers onto residential lots will not be
allowed.