Loading...
Sandy L Add(3)/PP-DR 960530 (4) ELECTRIC Comments for the City of Coppell Development Review Committee Preliminary/~m& Plat for ~~ '~~ ~(~l~/0 Date ~~O ~ ~~ ~- ~~ ~//Preliminary/~Plat is~"acceptable. Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined. Other comments Please call me at 214-888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234