Loading...
St Joseph Vill/FP-DR010830 (4) DEVELOPMENT REVIEW COX , j ENGINEERING COMMEI rTS ITEM: St. Joseph Village, Lots 1-4, Block A, Final Plat, request to allow the development of a retirement community and municipal facilities on approximately 51.17 acres of property located along the south side of Sandy Lake Road, approximately 1200' east of MacArthur Boulevard, at the request of St. Joseph Village, Incorporated. DRC DA TE: August 30, 2001 and September 6, 2001 CONTACT: Kenneth M. Griffin, P.E., Director of Engineering (972-304-3679) COMMENT STATUS: ,/PRELIMINARY 1. Show the existing floodplain adjacent to this site. Also, provide signature block for the floodplain administrator, along with required notes from the Floodplain Ordinance. 2. Please comment why the non-residential finish floor elevation is set higher than the residential finish floor elevation. 3. A drainage easement will be required across lot 3 for the proposed drainage system. 4. The curve data provided on page 2 stops at curve 68, however you are showing curves up through 92. Where is the information for 69-92? 5. On your water and sanitary sewer plans you are showing a proposed fire hydrant on Starleaf, south of Sandy Lake, and immediately adjacent to that you are showing a proposed fire hydrant on site. Are both fire hydrants necessary? May be able to eliminate the one on Starleaf. 6. On your storm sewer plan, you are showing 9 headwalls discharging into the channel along the north side of this development. You should consider running a parallel drainage system adjacent to the channel and only discharge twice into the channel. The introduction of headwalls into the channel will create erosion over a period of time.