Sandy L Add(1)/FP-CS 910923The City With A Beautiful Future
P.O. Box 478
Coppell, Texas 75019
214 - 462 - 0022
September 23, 1991
Mr. Mike Clark
Winkelmann & Associates, Inc.
12800 Hillcrest Road, Suite 200
Dallas, TX 75230
Re: Food Lion, Inc.
Final Acceptance
Dear Mr. Clark:
A final inspection of the above referenced project has been confirmed by
representatives of the City of Coppell.
Paving and utilities have been verified and are in compliance with the
City of Coppell standard requirements. Erosion protection will also be
maintained until bond expiration.
The one-year maintenance bonds and as-built drawings have been received
from the contractor. Maturity on the bonds will be one year from the date
of this letter (September 23, 1991).
Sincerely,,~ ~
Larry Davis
Construction Inspector
CLD/bd
cc:
M. Shohre Daneshmand, Acting City Engineer
Gary L. Sieb, Director of Planning and Community Services
Gary C~Hendricks, Consultant Engineer
Howar~/Pafford, Water Superintendent
Rey/Gonzales, Street Superintendent
R~k Wieland, Parks and Recreation Manager
~aryon Bowman, P&Z Coordinator
Dale Jackson, Building Official
Larry Davis, EMJ Corporation
FOODFIN