Loading...
Sandy L Add(1)/FP-CS 910923The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214 - 462 - 0022 September 23, 1991 Mr. Mike Clark Winkelmann & Associates, Inc. 12800 Hillcrest Road, Suite 200 Dallas, TX 75230 Re: Food Lion, Inc. Final Acceptance Dear Mr. Clark: A final inspection of the above referenced project has been confirmed by representatives of the City of Coppell. Paving and utilities have been verified and are in compliance with the City of Coppell standard requirements. Erosion protection will also be maintained until bond expiration. The one-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be one year from the date of this letter (September 23, 1991). Sincerely,,~ ~ Larry Davis Construction Inspector CLD/bd cc: M. Shohre Daneshmand, Acting City Engineer Gary L. Sieb, Director of Planning and Community Services Gary C~Hendricks, Consultant Engineer Howar~/Pafford, Water Superintendent Rey/Gonzales, Street Superintendent R~k Wieland, Parks and Recreation Manager ~aryon Bowman, P&Z Coordinator Dale Jackson, Building Official Larry Davis, EMJ Corporation FOODFIN