Sandy L Plz1P/PP-DR 970626 (6)"~ELEC TRIC
Date
Comments for the City of Coppell
Development Review Committee
Preliminary/~s~-i Plat for ~ ~
/-
C_,/preliminary/~B~/ Plat is-2~i acceptable.
Easements will be required for proposed electric facilities.
A plat with easement requirements will be provided to the
developer.
Load information (size of structure, A/C / Heat Load) will
b~e required from the developer before easements can be
determined.
~/Other comments ~z~ ~ 7~
?
Please call me at 2;f4-888-1307 if you have any questions.
Tim Brancheau
14400 Josey Lane Farmers Branch, Texas 75234