Loading...
Sandy L Plz1P/PP-DR 970626 (6)"~ELEC TRIC Date Comments for the City of Coppell Development Review Committee Preliminary/~s~-i Plat for ~ ~ /- C_,/preliminary/~B~/ Plat is-2~i acceptable. Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. Load information (size of structure, A/C / Heat Load) will b~e required from the developer before easements can be determined. ~/Other comments ~z~ ~ 7~ ? Please call me at 2;f4-888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234