Sandy L Add(3)/FP-DR 960725 (5)JUL 2 5 1996
~LI J[
DEVELOPMENT VIEW COMMI EE
ENGINEERING COMMENTS
ITEM: Sandy l~,~e A,4,~on (C~'_d4ren's ~ Ac~emv).~t 2. B~k A.
~ ~, ~ ~w the o~n of a ~ c~ ce~er on 1.937
~s of pmk.. ~ed on ~e we~ ~ of ~ud ~~
~pm~e~ 1~.93 fe~ ~ of ~ ~e ~, ~ the ~e~
of ~w~, ~on ~ ~~s, Inc.
DRC DA~: J~ 25. 1~ ~ Au~ 1. 19~
CO,ACT: M&e M~, E.I.T., ~~ ~ En~eer 0~3679)
COMMENT STA~S: ~PRELIMINARY F~.~ ,,.~ · · ~
1) Indicate location of fire lane.
2) Provide an easement for existing storm system at southeast corner of property.
3) The connection to the existing private 8" water line located at the southeast corner of the
property will not be allowed unless a signed agreement is acquired from the owner of the
private water line.
4) Provide utility easement for proposed vault.
5) Show visibility sight triangles at all ingress/egress points.
6) Show turning radius of firelane.
7) Site plan shows a 20' access easement. Which one is correct?
8) Label access easement as a fire lane.
Site Plan
1) Provide utility plans, drainage plans.
2) The proposed meters located along Samuel Blvd. need to be located in a utility easement so
they do not conflict with the proposed sidewalk which will be located in the right-of-way.
F. Y.I. Comments
1) Impact fees required.