Loading...
Sandy L PlzL4/Re-CS 870730The City With A Beautiful Futu e P.O. Box 478 Coppell, Texas 75019 214-462-0022 July 30, 1987 Children's World c/o Mark R. Smith Z8Z8 E. Purdue Street Dallas, Texas 75ZZ5 RE: Sandy Lake Plaza (Children's World) - Replat - Lot 4R, Block 1 Dear Mr. Smith: Listed below, please find the fees for the above referenced project which were calculated by Mr. Gabe Favre of Ginn, Inc., and were made available to me: Total Fees Fees Due Now S.U.P. Preliminary Plat Final Plat Replat Water & Sewer Availability ($1Z0/1000 S.F. Bldg. X 4950 S.F.) Water Tap Sewer Tap Construction Permit Fee: 1) Initial Deposit Z) 1.5% of construction Street Assessment (if applicable Moore Rd., 119 L.F. X $100/L.F.) Utility Inspection Fee * $ 106.00 -0- 104.00 $ 104.00 1Z1.46 1Z1.46 * 105.00 -0- 594.00 594.00 100.00 100.00 100.00 100.00 121.46 121.46 95.66 -0- 11,900.00 -0- 75.00 -0- TOTAL DUE $1,140.9Z * These fees have been paid. The amount of $1,140.9Z is due prior to the final execution of the final plat for recording purposes. Please make the check payable to the City of Coppell. please call me at 46Z-00ZZ, extension Z49. Sincerely, Shohre Daneshmand Civil Engineer If you have any questions, SD/lsg cc: Frank Trando, Finance Director Taryon Bowman, P & Z Coordinator Gabe Favre, Ginn, Inc. Steve Goram, Public Works Director