Sandy L PlzL4/Re-CS 870630GINN, INC.
CONSULTING ENGINEERS
DATE:
TO:
FROM:
SUBJECT:
June 30, 1987
Taryon Bowman, P&Z Coordinator
Ginn, Inc.
Children's World
In accordance with your request, we have calculated fees for the
subject project. We do not recall reviewing this project, unless
it was a portion of Sandy Lake Plaza; and then we only reviewed
it for a S.U.P. (for 7-11 store).
The following fees could be assessable to the project:
Preliminary Plat ($100+4.00/lot)
Final Plat ($100+35.00/acre)
Replat ($100+5.00/lot)
Water/Sewer Availability
($120/1000 SF bldg.)
Water Tap
Sewer Fee
Construction Permit Fee 1. Initial Deposit
2. 1.5% of Construction
Street Assessment (if applicable
Moore Road (119 LF x $100/lf)
Utility Inspection Fee
104.00
121.46
105.00
100.00
100.00
121.46
95.66
11,900.00
75.00
*need SF of building to calculate
If we may be of further assistance, please contact us.
/jc
cc:
Alan Ratliff
Frank Trando
Wayne Ginn
TB610.305
17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/2484900