Loading...
Sandy L PlzL4/FP-CS 870630GINN, INC. CONSULTING ENGINEERS DATE: TO: FROM: SUBJECT: June 30, 1~87 T~ryon BgWman, Paz Glnn, I~c. Chil~n's World Coordinator In accordance with your request, we have calculated fees for the subject project. We do not recall reviewing this project, unless it was a portion of Sandy Lake Plaza; and then we only reviewed it for a S.U.P. (for 7-11 store). The following fees could be assessable to the project: Preliminary Plat ($100+4.00/lot) Final Plat ($100+35.00/acre) Replat ($100+5.00/lot) Water/Sewer Availability ($120/1000 SF bldg.) Water Tap Sewer Fee Construction Permit Fee 1. Initial Deposit 2. 1.5% of Construction Street Assessment (if applicable Moore Road (119 LF x $100/lf) Utility Inspection Fee 104.00 121.46 105.00 * 100.00 100.00 121.46 95.66 11,900.00 75.00 *need SF of building to calculate If we may be of further assistance, please contact us. Gabe Fa re /jc cc: Alan Ratliff Frank TrandoF Wayne Ginn TB610.305 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/2484900