Riverview Est/FP-DR 961031 (7)"~.~ELEC TR I C
CITY OF COPPELL
DEVELOPMENT REVIEW COMMITTEE
October 31, 1996
SUBJECT: RIVERVIEW ESTATES
FINAL PLAT IS NOT ACCEPTABLE.
EASEMENTS WILL BE REQUIRED FOR THE PROPOSED ELECTRIC FACILITIES. A
PLAT WITH EASEMENT REQUIREMENTS WILL BE PROVIDED TO THE DEVELOPER.
LOAD INFORMATION (SIZE OF A/C, HEAT LOAD) WILL BE REQUIRED FROM THE
DEVELOPER BEFORE EASEMENTS CAN BE DETERMINED.
PLEASE CALL ME AT 972-888-1307 IF YOU HAVE ANY QUESTIONS.
TIM BRANCHEAU