Shadowridge P1/FP-CS 850107GINN, INC. CONSI;LTING ENGINEERS
January 7, 1985
Mr. Harold Dixon
GRAYSON LAND CO.
3136 Routh Street
Suite 203
Dallas, TX 75201
Re: Shadowridge Estates
Coppell, Texas
Dear Mr. Dixon:
On December 28, 1984, a final inspection was conducted on the pavement
portion of the above referenced project by C. B. Rodgers (City of Coppell)
and our inspector, Paul Lusk. The pavement has been completed in accordance
with plans and specifications and is hereby accepted by the City of Coppell
as of December 28, 1984, which is the beginning date of the one-year warranty
period.
Sincerely,
GINN, INC.
H. Wayne Ginn, P.E.
City Engineer
GF:HWG:sr
cc:
Ron Ragland
Mark Sweeney
Lightning Construction Co.
C. B. Rodgers
16135 Preston Road · Suite 106 · Dallas, Texas 75248 · Phone 214/386-6611