Loading...
SandyLCrossL3/PP-CS 880329March 29, 1988 COPPELL PUBLIC WORKS TO: FROM: RE: Taryon Bowman, Planning & Zoning Coordinator Steve Morton, Chief Public Works Inspector Sandy Lake Crossing (Exxon) Preliminary Plat~ After reviewing the above referenced item with Public Works Supervisors, please find below items which are needed for preliminary plat approval: A conceptual paving plan A conceptual utility plan A conceptual landscaping plan A vicinity drainage plan If further information is needed, please advise. SMM/sm CC: Steve Goram Per Birdsall Richard Diano Howard Pafford