Loading...
SandyLCrossL3/PP-DR 880329 (2)The City With A Beautiful Future P.O. Box 478 Copl3ell, Texas 75019 214-462-0022 DEYELOPMENT REVIEW COMMITTEE INSPECTIONS DEPARTMENT Staff Comments Sandy Lake Crossin§ (Exxon) - Preliminary Plat Date March ~9, 1988 Reviewed By Dale Jackson, Building Official If you should have any questions regardi~ tk. ~ above mentioned comments, please contact Dale Jackson, Building Official, a'~ =~ L-? © i C, CITY OF COPPELL ENGINEERING DEPARTMENT DRC DATE: REV I E,,,' OF: BY: ~hohre Daneshmand, Civil Engineer PRELIMINARY PLAT AND PLANS: ~) 3) 4) Please make the following additions and/or corrections, as marked: The names and zoning of adjacent properties, names on record of owners of adjoining parcels. The location, widths and names of all existing and proposed streets, easements, fire lanes or other public ways within or adjacent to the tract. Existing and proposed zoning of the site and the surrounding properties. Topography of the site (intervals of 5 feet or less,referred to sea level datum). Per Floodplain Management Ordinance, (Art. 5, Sec. C, Item 4, Page ]4), all subdivision proposals must have the following note placed on the preliminary and final plats: "Floodplain Development Permit Application No. has been filed with the City of Coppell Administrator on , 19 Floodplain (Floodplain Administrator) No Comment. (Date) in the preliminary engineerin~ plans. The following information, as marked, is required to be contained Submit preliminary engineering plans. The plans shall show existing structures . utilities . sewers . . . water mains culverts and other under,round structures within the tract immediately adjacent thereto w~th pipe sizes and locations. 5) 7) Preliminary plans of proposed water distribution system . sewage collection system . . . , and their relation to the existing utilities in the area, and to the Utility Master Plan. Provide a Drainage Area Map, covering two parts: a) show On-site Drainage Map, on a scale of 1" ~ 20', 40', 50', etc . . .; with all details as required in the Subdivision Ordinance; b) show the Off-site Drainage Map, on a scale of 1" = 100', 200', etc . Delineate the project's boundary on it, plus the less detailed drainage system, to clearly demonstrate the affect of such activities, drainage outfalls, on the adjacent properties and the Drainage Master Plan. If the applicant is requesting any variance to the Subdivision Ordinance, be must submit a letter specifically outlining his respective requests. Show the boundaries of the lO0-year Floodplain and Floodway clearly on the preliminary and final plats. Ail above comments must be addressed, prior to Engineering Staff's final recommendation on this plat. D RC / COM~. ?E:,;T S / ENG/PREL IM Y. EMO 1