Loading...
Summer Place/PP-CS 850214 (2) Date: Rev. No: 2-14-85 0 Bo DEVELOPMENT IMPACT ANALYSIS SUMMER PLACE General 1. Development Name and size: Summer Place, 15.44 acres 2. Owner: Summer Place Coppell - A Partnership 3. Engineer: Cummings & Pewitt 4. Current zoning: 2F-9 single family residences 5. -Current status of development: Preliminary Plat 6. Location: N of Sandy Lake Road 1200' E of Coppell Rd. 7. Proposed density: 6 lots/acre 8. Annexation or land study required: none 9. Issues resolved: none 10. Issues to be resolved: San. sewer connec.;looping water main 11. Dedications required: 25' for Sandy Lake Road Impact 1. Traffic: a. Off-site collector streets: none b. Off-site arterial streets: Sandy Lake Road 2. Sewer: a. Proposed mains: 8" minimum - 27,000 gpd b. Proposed connections to existing mains: at Cottonwood Dr. 6" main 3. Water: 8" main, connect at Sandy Lake demand 40,000 gpd 4. Drainage or Flow: Outlet at 25' easement at Cottonwood Dr., flow not determined yet 5. Schools: a. Primary School: 50 students b. Middle school: 30 students C. Approvals and Fees 1. Fees: Item Fees Required Paid to date $ 476.00 $ 2,380.00 $15,826.00 $37,000.00 $37,000.00 $14,100.00 Preliminary Plat Pinal Plat Construction Permit Fee Water Availability Fee Sewer Availability Fee Park Development 2. Assessments and Pro Rata Charges: To be determined a. Item: Summary: b. Item: Summary: ® Approvals a. Annexation b. Land study: P&Z, City Council c. Zoning: P&Z, City Council d. Preliminary Plat: City Engineer: Planning & Zoning: City Council: e. Final Plat City Manager: City Engineer: Planning & Zoning: City Council f. Construction Plans: City Manager: City Engineer: g. File approved plat: h. Letter of acceptance: i. Receive as-builts: j. End of warranty period: N/R N/R N/R 1-24-85