Summer Place/PP-CS 850214 (2) Date:
Rev. No:
2-14-85
0
Bo
DEVELOPMENT IMPACT ANALYSIS
SUMMER PLACE
General
1. Development Name and size: Summer Place, 15.44 acres
2. Owner: Summer Place Coppell - A Partnership
3. Engineer: Cummings & Pewitt
4. Current zoning: 2F-9 single family residences
5. -Current status of development: Preliminary Plat
6. Location: N of Sandy Lake Road 1200' E of Coppell Rd.
7. Proposed density: 6 lots/acre
8. Annexation or land study required: none
9. Issues resolved: none
10. Issues to be resolved: San. sewer connec.;looping water main
11. Dedications required: 25' for Sandy Lake Road
Impact
1. Traffic:
a. Off-site collector streets: none
b. Off-site arterial streets: Sandy Lake Road
2. Sewer:
a. Proposed mains: 8" minimum - 27,000 gpd
b. Proposed connections to existing mains: at Cottonwood Dr.
6" main
3. Water: 8" main, connect at Sandy Lake demand 40,000 gpd
4. Drainage or Flow: Outlet at 25' easement at Cottonwood Dr.,
flow not determined yet
5. Schools:
a. Primary School: 50 students
b. Middle school: 30 students
C. Approvals and Fees
1. Fees:
Item Fees Required Paid to date
$ 476.00
$ 2,380.00
$15,826.00
$37,000.00
$37,000.00
$14,100.00
Preliminary Plat
Pinal Plat
Construction Permit Fee
Water Availability Fee
Sewer Availability Fee
Park Development
2. Assessments and Pro Rata Charges: To be determined
a. Item:
Summary:
b. Item:
Summary:
®
Approvals
a. Annexation
b. Land study: P&Z, City Council
c. Zoning: P&Z, City Council
d. Preliminary Plat:
City Engineer:
Planning & Zoning:
City Council:
e. Final Plat
City Manager:
City Engineer:
Planning & Zoning:
City Council
f. Construction Plans:
City Manager:
City Engineer:
g. File approved plat:
h. Letter of acceptance:
i. Receive as-builts:
j. End of warranty period:
N/R
N/R
N/R
1-24-85