Loading...
Summer Place/FP-CS 850508 (2)ae Be Date Rev. No 5-8-85 1 DEVELOPMENT IMPACT ANAn¥SIS SUMMER PLACE General 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. Development Name and size: Summer Place, 15.65 acres Owner: Summer Place Coppell - A Partnership Engineer: Cummings & Pewitt Current zoning: 2F-9 single family residences Current status of development: Preliminary Plat Location: N of Sandy Lake Road 1200' E of Coppell Rd. Proposed density: 6 lots/acre Annexation or land study required: none Issues resolved: none Issues to be resolved: San. sewer connec.;looping water main Dedications required: 25' for Sandy Lake Road Impact 1. Traffic: a. Off-site collector streets: none b. Off-site arterial streets: Sandy Lake Road 2. Sewer: a. Proposed mains: 8" minimum - 27,000 gpd b. Proposed connections to existing mains: at Cottonwood Dr. 6" main 3. Water: 8" main, connect at Sandy Lake demand 40,000 gpd 4. Drainage or Flow: Outlet at 25' easement at Cottonwood Dr., flow not determined yet 5. Schools: a. Primary school: 50 students b. Middle school: 30 students C. Approvals and Fees Fees: Item Preliminary Plat Final Plat Construction Permit Fee Water Availability Fee Sewer Availability Fee Park Development Fees Required $ 476.00 $ 2,460.00 $15,826.00 $49,000.00 $49,000.00 $14,700.00 .Paid to date 2. Assessments and Pro Rata Charges: To be determined ao Item: Sandy Lake Road Summary: 300.5' x $75 b. Item: Street Signs Summary: 2 ea x $143.75 = $288 Ce Item: Street Lights Summary: To be determined 0 Approvals a. Annexation b. Land study: P&Z, City Council c. Zoning: P&Z, City Council d. Preliminary Plat: City Engineer: Planning & Zoning: City Council: e. Final Plat City Manager: City Engineer: Planning & Zoning: City Council f. Construction Plans: City Manager: City Engineer: g. File approved plat: h. Letter of acceptance: i. Receive as-builts: j. End of warranty period: N/R N/R N/R ;- 4-85 5-6-85