SandyLCrossL3/FP-CS 881215December 15, 1988
CITY OF COPPELL
PLANNING DEPARTMENT
STAFF REPORT
RE: Sandy lake Crossing, Lot 3, Block 1 - Final Plat
LOCATION:
Southwest corner of Sandy Lake Road and Denton Tap Road
APPLICANT:
Exxon Corporation
SUMMARY:
Applicant is requesting approval of a final plat. If
approved, the plat will allow for the construction of
a gasoline service station.
ALTERNATIVES: Approve the final plat.
Deny the final plat.
ATTACHMENTS: Final plat.
SLCFINAL.STR,
GINN, INC.
CONSULTING ENGINEERS
November 23, 1988
Taryon Bowman
City of Coppell
P.O. Box 478
Coppell, TX 75019
Re:
Sandy Lake Crossing, Lot 3, Block 1
Final Plat
DRC - Engineering
Dear Taryon:
We have reviewed the above referenced subject and offer the
following comments.
Applicant should escrow, at this time, their portion of
funds required for the future improvements to Sandy Lake
Road. This roadway is classified ultimately as a 6-lane
divided major thoroughfare. Based on a future estimated
cost of $200.00 per front foot for this roadway and 60.43 LF
of frontage still unimproved, the escrow should be in the
amount of $12,086.00. The actual amount due to the City
will be based on the actual cost when constructed and the
escrow account adjusted accordingly at that time. This
escrow will be required in lieu of the construction of a
half street.
Applicant should add to the final plat the Floodplain Permit
note as required per the City's Comprehensive Floodplain
Ordinance, paragraph 4, page 34. This particular parcel,
however, will be "Not Applicable" regarding a Floodplain
Development Permit.
Please call if you have any questions.
Sincerely, ~ ~
Kevin Peiffer,[/~. E.
cc: Hamill & McKinney, Architects & Engineers - Wayne Barr, P.E.
17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900
Al
ARCHITECTS-ENGINEERS, INC.
1304 walnut hill lane
suite 222
irwn§, texas 75038
[214] 580-0461
December 9, 1988
Mr. Howard Pafford
Water Utilities Foreman
City of Coppell
Coppell, Texas
Re: Sandy Lake Crossing Comments
Dear Mr. Pafford:
I am writing this letter in regards to the comments we received
from you dated December 5, 1988. The placement of the water
meter and double check valve will be located and shown on the
construction drawings that will be submitted to the city.
Also, the car wash tie-in will be shown and located on the same
construction drawings. I am enclosing a copy of your letter
for the Planning and Zoning Committee's reference.
If you have any questions, please call.
Sincerely,
Wayn6Barr
Hamill & McKinney, Architects-Engineers, Inc.
WB/gkm
Enclosure
cc: Roger Finholt
DALLAS TX (214) 5800461 · LEXINGTON. KY (606] 278 3215 . SAN FRANCISCO. CA(415) 93247~3. ATLANTA GA 14041421 00~4
(~'~ The City With A Beautiful Future
December 5: 1988
P,O. Box 478
Coppell, Tekas 75019
214 - 462 - 0022
Wayne Barr
Hamil & McKinney
1304 Walnut Hill Ln.
Suite 222
Irving, Texas 75038
RE:
Sandy Lake Crossing (Exxon) Final Plat
Dear Mr. Barr: ~
Following my review of the revi~ed plat, I have the following comments
to make.
Need to show placement of water meter and double check valve
with written explanation for each (note the sizes).
2) Show water tie-in for the car wash on site.
If comments cannot be addressed prior to Dec. 15, 1988, Planning &
· Zoning meeting,, please 'submit a letter stating that these comments
will be addressed in the construction plans.
Also, attached you will find a letter addressing the Water and Sewer
fees.
If you have any questions, please feel free to contact me at 462-8495.
Silncerely, /~ / ~
w/ _
Howard
L. Pafford_~/
Water Utilities ~Foreman
HLP/bb
cc: Steve Goram, Di?ector of Public Works
Taryon BowmaD, Planning & Zoning Coo'rdinator
Attachment
The City With A-Beautiful FutureI
P.O. Box 478
Copp, ell, Texas 75019
214 - 462 - 0022
December 5, 1988
Wayne Barr
Hamil & McKinney
1304 Walnut Hill Lane
Suite 222
Irving, Texas 75038
RE: Sandy Lake Crossing (Exxon) - Final Plat - Water & Sewer Fees
Below I have listed all fees associated with Water and Sewer~
Water Availability
For 1104 sq. ft. building @ $60.00/1000 sq. ft.
(50% due prior to Council approval)
(50% due at time of Building Permit)
$66.24
$33.12
$33.12
Sewer Availability
For 1104 sq. ft. building @ $60.00/1000 sq. ft.
(50% due pri~or to Council approval)
(50% due at time of Building Permit)
$66.24
$33.12
$33.12
Water Tap Fee
For 1 connection
(100% due at time of Building Permit)
$100 00
Sewer Tap Fee
For 1 connection
(100% due at time of Building Permit)
Utility Inspection Fee
(100% due at time of Building Permi~t)
$1oo.0o
· $75 oo
~of Building Permit.
Ail initial fees need to be paid 'by December 20, 1988 to Carolyn
Bebermeyer, Attn:~ Finance Department, P.O. Box 478, Coppell, Texas
7501~. ~
All other fees are due and payable to Building Inspections a-t time
If you have any questions regarding this matter, please contact me
at 462-8495.
S~cerely, ~-, j~ ~
Howard PaffordV~/
Water Foreman ~
HLP/sm