Loading...
Summit 1P/PP-AG 960611 ~Frth A B~utiful Fu~ur~ CITY COUNCIL MEETING: AGENDA REQUEST FORM June 11, 1996 ITEM CAPTION: Consideration and approval of the Summit at the Springs, Preliminary Plat, to allow the development of a 70-lot planned development, single-family residential subdivision on 29.88 acres of property located on the south side of Bethel Road, approximately 500' west of Denton Tap Road. ,4 BY ~~ ~., ! ~ COUNCIL ¢'~~'/'~¢' DATE ~ -//-¢~' - Gary L. Sieb Director of Planning and Comm. Services SUBMITTED BY: TITLE: STAFF COMMENTS: INITIALS Date of P&Z Meeting: May 16, 1996 Decision of Commission: Approved (6-0) with Commissioners Lowry, Wheeler, McCaffrey, Cruse, Reyher and Stewart voting in favor. None opposed. STAFF RECOMMENDATION Approval ~ Denial EXPLANATION: Approval subject to Engineering comments (attached). BUDGET AMT.$ FINANCIAL COMMENTS:~ AMT. EST.$ +/- BUD:$ FINANCIAL REVIEW~ Agenda Request Form - Revised 1/94 Pu~ 'gokl~n..xxl' l~lx~r i~ CITY MANAGER REVIEW: Document Name ozsummit.99 AGENDA REQUEST NARRATIVE SUMMIT AT THE SPRINGS, PRELIMINARY PLAT Conditions for approval: (1) Compliance with Engineering comments as follows: Landscaping Plans: The Preliminary Entry Development East Entry Scheme 2 shows the roadway coming off of Bethel Road to be 15 feet in width, however, the plat shows 21 feet in width. These should be consistent. Also, the exit should be a minimum of 25 feet in width. These are informational comments and shoUld have no bearing on the approval of the plat: 1. Some type of slope protection may be required in the bend of Grapevine Creek adjacent to lot 45, Block B and Lot IX, Block A. 2. A floodplain reclamation study will be required. 3. There will be no parking on the street for lots adjacent to the narrow paving for the streets and cul-de-sacs. 4. Impact fees will be required. agenda Narrative - Revised 1/94 CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE: SUMMIT AT THE SPRINGS, PRELIMINARY PLAT P & Z HEARING DATE: May 16, 1996 C.C. HEARING DATE: June 11, 1996 LOCATION: South side of Bethel Road, approximately 500' west of Denton Tap Road SIZE OF AREA: 29.88 acres; 70-lot subdivision CURRENT ZONING: PD-SF-9 REQUEST: Preliminary Plat approval APPLICANT: Owner: Baptist Foundation of Texas 1601 Elm St.,//1700 Dallas, TX 75201-7241 (214) 978-3333 FAX (214) 978-3397 Representative: Dowdey, Anderson & Assoc. 16250 Dallas Parkway//100 Dallas, TX 75248 (214) 931-0694 FAX (214) 929-1241 glISTORY: The City Council approved the planned development, single- family-9 zoning on February 27, 1996. TRANSPORTATION: Bethel Road is a 2-lane undivided asphalt road with side ditches in a 50'-wide fight-of-way, proposed to be a C2U collector street within a 60'-wide fight-of-way from Coppell Road to Grapevine Creek and within a 90' fight-of-way from Grapevine Creek to Denton Tap Road. Item// 8 SURROUNDING LAND USE & ZONING: North - South - East - West Vacant; "C"- Commercial Zoning Elementary School, School District Administrative and Maintenance Facilities; 'C"- Commercial Zoning Vacant; "PD-LI"- Planned Development, Light Industrial Zoning Vacant, Grapevine Springs Park; "PD-LI"-Planned Development, Light Industrial Zoning COMPREHENSIVE PLAN: The 1987 Plan showed a special use district. The revised proposal suggests a residential use. DISCUSSION: The approved Planned Development site plan showed a total of 74 residential lots while this preliminary plat is showing a total of 70 lots. The reduction of 4 lots was to mitigate the potential problems with certain cul-de-sacs which could pose problems to fire trucks. The applicant needs to make a number of minor corrections to the plat, landscape and elevation plan such as show the type and quantity of planting material going to be used at the subdivision entry, provide dimensions of the proposed subdivision sign and comply with the engineering comments. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff recommends approval of the preliminary plat subject to the following conditions being met: 1) Provide a complete listing of quantity of planting material to be used at the subdivision entry. 2) Provide elevations of proposed subdivision signage showing dimensions of the lettering. 3) Comply with engineering comments. ALTERNATIVES: 1) Recommend approval of the Preliminary Plat 2) Recommend disapproval of the Preliminary Plat 3) Recommend modification of the Preliminary Plat 4) Continue the Hearing ATTACHMENTS: 1) Preliminary Plat 2) Tree Survey 3) Preliminary Entry Development 4) Engineering Comments Item # 8 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Summit at the Springs~ IVeliminazv Plat. to allow the development of a 7~.~t siltgle-family residetttial subdivislott on 29.88 acres of property, located on the south side of Bethel Road, approximately 500' west of Denton Tap Road at the request of Dowdey, Anderson and Assoc. DRC DATE: April 25, 1996 and May 2, 1996 CONTACT: Mike Martin, E.I.T., Assistant City Engineer 004-$679) COMMENT STATUS: p~, ~'..~,..,...... 7,,.,~r,,..~... g, v ,/'FINAL PdFA, q-frgD Landscaping Plans: The Preliminary Entry Development East Entry Scheme 2 shows the roadway coming off of Bethel Road to be 15 feet in width, however, the plat shows 21 feet in width. These should be consistent. Also, the exit should be a minimum of 25 feet in width. These are informational comments and should have no bearing on the approval of the plat: 1. Some type of slope protection may be required in the bend of Grapevine Creek adjacent to lot 45, Block B and Lot 1X, Block A. 2. A floodplain reclamation study will be required. 3. There will be no parking on the street for lots adjacent to the narrow paving for the streets and cul-de-sacs. 4. Impact fees will be required. ~ ,,Z~,Z[.LO S Z '"' J of requests. Councilmember Sturges moved to close the Public Hearing and approve Resolution No. 061196.1 with the following amendments: 1) a definition for ~building' to be 'municipal buildings in operational use excluding storage facilities' be placed in the resolution; 2) Section II-E-2 the word 'suggested' be stricken and read '... the charge is $.12...'; 3) Section II-N-1 shall be amended to show the charge for video tapes to be $10.00 for each tape without regard to duration. Councilmember Robertson seconded the motion; the motion carried 6-0 with Mayor Pro Tem Mayo and Councilmembers Alexander, Sturges, Watson, Tunnell, and Robertson voting in favor of the motion. 15. Consider approval of a Resolution establishing procedures and cost of providing Public Information, and authorizing the lVlayor to sign. This item was considered under Item 14. See Item 14 for minutes. Item 18 was considered at this time. 16. Consider approval of the Summit at the Springs, Preliminary Plat, to allow the development of a 70-lot planned development, single-f~y residential subdivision on 29.88 acres of property located on the south side of Bethel Road, approximately .~00' west of Denton Tap Road. Gary Sieb, Director of Planning and Community Services, made a presentation to the Council. Council made inquiries and asked for clarification at to the exact boundaries of this property. Councilmember Robertson moved to approve Summit at the Springs, Preliminary Plat, to allow the development of a 70-lot planned development, single-family residential subdivision on 29.88 acres of property located on the south side of Bethel Road, approximately 500' west of Denton Tap Road and that the Planning and Zoning Commission be the final authority on the final plat. Mayor Pro Tem Mayo seconded the motion; the motion carried 6-0 with Mayor Pro Tem Mayo and Councilmembera Alexander, Sturges, Watson, Tunnell, and Robertson voting in favor of the motion. 17. Consider approval of Village at Cottonwood Creek, Section V, Preliminary Plat, to allow the development of a .~8-1ot single-family residential subdivision on 16.8 acres of property located at the northeast corner of Sandy Lake and Coppeli Roads. Gary $ieb, Director of Planning and Community Services, made a presentation to the Council. Councilmember Tunnell inquired as to the airport noise issue and the Applicant indicated he would put the standard notice on the face of the plat. Pat At_k-ins, representing Grand Homes, addressed the Council regarding alley and traffic concerns. Councflmember Tunnell expressed her concerns to the City Engineer regarding the street flooding issue. Ken Griffin, Assistant City Manager/City Engineer, addressed the flooding issue and stated any problems would be resolved before constructions plans would be approved. Mr. Griffin also indicated that 13 notification letters had been sent regarding the alley issue and only two responses were received; however he would recommend that the alley be turned back into the subdivision. Councilmember Alexander moved to approve Village at Cottonwood Creek, Section V, Preliminary Plat, to allow the development of a 58-1ot single-family residential subdivision on 16.8 acres of property located at the northeast comer of Sandy Lake and Coppell Roads with the