Loading...
Summit 1P/PP-DR 960425 (4)DEVELOPMENT REVIEW COMMITTEE BUILDING INSPECTION COMME2YI~ ITEM: Summit at the Springs DRC DATE: April 25, 1996 CONTACT: Greg Jones, Chief Building Officid (304-3500) COMMENT STATUS: ,[. INITIAL ~,~t 1. Loll 44 and 45 have 20' rear yard setback requirements Lot 43 has an adjoining 8' sideyard. Do you want to a___&!ress this inequity by notation on plat? /~,~ ~ 2. Lot 2 needs a fence note to hold fence back at 15' line. 3. Loll20,21,25,26,33,35,38 and44. ~t'' ff 4. Are lols 42 and 43 buildable due to floodplain proximity wiflfin lhe loft drc14252