Loading...
Summit 1P/PP-DR 960425 (6) I l ~YELECTRIC Date Comments for the City of Coppell Development Review Committee Preliminary/~-i~n~T Plat for Preliminary/~Plat is ~Wa-acceptable. ~/Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined. Other comments ~4~ ~ { 7~/ /~/~ /~ ~/ ~)/~ Please call me at 214-888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234