Summit 1P/PP-DR 960425 (7)it ~¥-9~J~
DEVELOPMENT REVIEW COMMII':i'EE '
LEISURE SERVICES COMMENTS
II~!: Summit at the Springs, Preliminary Plat, at the request of
Dowdey, Anderson and Associates.
DRC DATE: April 25, 1996 and May 2, 1996
CONTACT: Gary D. Sims, Director of Leisure Services, (304-3560)
COMMENT STATUS: ,/PRE~MINAR Y FINA~ ~
The Leisure Services Department has reviewed the above referenced
development and has the following comments.
Signed and sealed Irrigation Plans as identified in the Subdivision
Ordinance are required.
Irrigation controllers identified are to have the following:
Rain Sensor
Freeze Protection device
Surge Protector
Signed and sealed landscape plans as identified in the Subdivision
Ordinance are required.
Any work which affects city maintained rights of way, parkways, or
medians needs to be identified and coordinated through the Leisure
Services Superintendent (304-3554).
The proposed development is identified in the Trails System Master Plan
as a part of the Beltline /Denton Tap Cooridor Trails. The alignment
for this trail and possible construction will need to be addressed.
Contact with the Leisure Services Director (304-3560) will be necessary.
The proposed development will be required to follow the guidelines as
established in the Parkland Dedication Ordinance. This proposed
development is located in Park Zone 1. A fee of $1,285 per dwelling
unit will be required at the time of final plat approval.
Should there be any questions by committee members or representatives of the
proposed development regarding these comments, please feel free to contact
Rick Wieland at 304 -3553, or Gary Sims at 304 -3560.
GDS/rsw
DRC425.96B