Loading...
Summit 1P/FP-DR 960530 (4)TI. IELECTRIC , Date Comments for the City of Coppell Development Review Committee P~Final Plat for~~ ~/~_-cli~in~-~7Final Plat is not acceptable. --/ t/Easements will be re~ired for proposed electric facilities. A plat with easement requirements will be provided to the developer. ~ Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be dete~ined. Other co~ents ~ Please call me at 214-888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234