Summit P1/Re-DR 980827DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: Summit at the S_t~rings. Phase L Ret~lat of Lots 36 and S Z Block B and
Summit at the St~rinos. Phase II. Retdat o£Lots 31. 34. 41. 42. and 43. Block
B__ to allow the recordation of the new flood limit on selected lots along the
west side of Lexington Avenue and Edmondson Drive at the request of
Dowdey, Andersen and Associates
DRC DATE: August 27, 1998 to September 3,1998
CONTACT: Mike Martin, P.E., Assistant City Engineer (304-3679)
COMMENT STATUS: PP~L!P,~.rARY v/FINAL
AFTER o~
No Comments.