Summit P2/AmP-DR 980625 (2)DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: Summit at the Svrines. Phase II. Amendin~ Plat. to correct the dimension
shown on the eastern property line of Lot 26, Block B from 188.03 to 187.99
feet, at the request of Dowdey Anderson and A~sociates, Inc.
DRC DATE: June 25, 1998 and July 2, 1998
CONTACT: Mike Martin, P.E., Assistant City Engineer (304-3679)
COMMENT STATUS
Show minimum finish floor elevation for lots adjacent to floodplain.
Provide radius dimension for Stanton Court.
A Final Letter of Map Revision (LOMR) needs to be provided for this development.
JUN 2 6 1998