Loading...
Summit P2/AmP-DR 980625 (5) I I "~ELECTRIC JUN261998 i~ ~ Comments for the City of Coppell Development Review Committee Pit~illl~lltl~ll~ Plat for Date __Preliminary/Final Plat is not acceptable. __Easements will be required for proposed electric/gas facilities. A plat with easement requirements will be provided to the developer. __Load information (size of structure, A/C, heat load) will be required from the developer before easements can be determined. ~Other comments Please call me at 972/888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234