Summit P2/AmP-DR 980625 (5) I I
"~ELECTRIC
JUN261998 i~ ~
Comments for the City of Coppell
Development Review Committee
Pit~illl~lltl~ll~ Plat for
Date
__Preliminary/Final Plat is not acceptable.
__Easements will be required for proposed electric/gas facilities. A plat with
easement requirements will be provided to the developer.
__Load information (size of structure, A/C, heat load) will be required from the
developer before easements can be determined.
~Other comments
Please call me at 972/888-1307 if you have any questions.
Tim Brancheau
14400 Josey Lane Farmers Branch, Texas 75234