Loading...
Shadow Woods/FP-CS 890509FILE GINN, INC. May 9, 1989 CONSULTING ENGINEERS Ms. Taryon Bowman City of Coppell P.O. Box 478 Coppell, TX 75019 Re: Shadow Woods Estates Final Plat & Construction Plans DRC - Engineering Dept. Dear Taryon: We have reviewed the above referenced project and offer the following comments. Regarding the Final Plat we address the following items. At time of final platting, applicant shall be required to submit an escrow of $90,007.00 for their one-half cost obligation to Coppell Road. This amount is based on a $100.00 per front foot estimated cost. The actual amount due to the City will be based on the actual cost when constructed and the escrow account adjusted accordingly at that time. This escrow will be required in lieu of the construction of a half street. The city shall provide an escrow agreement to the applicant to be executed prior to the final plat appearing before City Council. Alleys in Blocks B & C appear to be questionable regarding sight distance provided due to layout proposed. Prior to final platting, submit a Floodplain study for review by the City's Floodplain Administrator, Mr. Russell Doyle, P.E., showing how the determination was made to allow shifting the 100 yr floodplain limit line from its original location indicated when SF-0 was proposed to the present location submitted with the SF-9 proposal. 4. Add Trench Safety Plans to the construction plans. Ail other construction plan comments are indicated on the plans. 15' drainage easement needs to be provided yet between lots 17 & 18 to provide for positive emergency overflow for storm runoff. 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 We have no objections to the final plat if the applicant addresses the above items appropriately. Sincerely, Kev~~~~~-E KP/dsp cc: File 89305 (shdwood.drc)