Shadow Woods/FP-CS 890425GINN, INC.
CONSULTING ENGINEERS
April 25, 1989
Ms. Taryon Bowman
City of Coppell
P.O. Box 478
Coppell, TX 75019
Re:
Shadow Woods Estates
Final Plat & Construction Plans
DRC - Engineering Dept.
Dear Taryon:
We have reviewed the above referenced project and offer the
following comments.
Regarding the Final Plat we address the following items.
Per the City's Comprehensive Floodplain Management Ordinance
(CFMO), a permanent benchmark must be referenced on the
plat. This benchmark must be tied to the City's Reference
Marks (NGVD). Please reference pages 33-35 of the CFMO.
At time of final platting, applicant shall be required to
submit an escrow of $90,007.00 for their one-half cost
obligation to Coppell Road. This amount is based on a
$100.00 per front foot estimated cost. The actual amount
due to the City will be based on- the actual cost when
constructed and the escrow account adjusted accordingly at
that time. This escrow will be required in lieu of the
construction of a half street. The city shall provide an
escrow agreement to the applicant to be executed prior to
the final plat appearing before City Council.
Alleys in Blocks B & C apDear to be questionable reqardinq
sight distance provided due to layout proposed.
Prior to final platting, submit a Floodplain study for
review by the City's Floodplain Administrator, Mr. Russell
Doyle, P.E., showing how the determination was made to allow
shifting the 100 yr floodplain limit line from its original
location indicated when SF-0 was proposed to the present
location submitted with the SF-9 proposal.
17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900
Se
e
Line A, sanitary sewer does not stay within the easement
provided on the plat.
Add Trench Safety Plans to the construction plans.
Ail other construction plan comments are indicated on the
plans.
Sincer~ ~
Kevin Peiffer~,~~.E.
KP/dsp
cc: File 89305