Shadow Woods/PP-CS 881123GINN, INC.
CONSULTING ENGINEERS
November 23, 1988
Taryon Bowman
City of Coppell
P.O. Box 478
Coppell, TX 75019
Re:
Shadow Woods Estates Addition
Zoning, Preliminary Plat, Water, Sewer and Drainage
DRC - Engineering
Dear Taryon:
We offer the following comments regarding the above referenced
zoning exhibit, preliminary plat, water, sewer and drainage plans.
32.5' wide right-of-way dedication required along Coppell
Road as per DeShazo, Starek & Tang's traffic study.
Prior to final platting, submit a floodplain study for
review by the City's Floodplain Administrator, Mr. Russell
Doyle, P.E., showing how the determination was made to allow
shifting the 100 yr floodplain limit line from its original
location indicated when SF-0 was proposed to the present
location submitted with the SF-7 proposal.
Block A, between lots 21 and 22 provide a 15' drainage
easement.
At time of final platting, applicant shall be required to
submit an escrow of $90,007.00 for their one-half cost
obligation to Coppell Road. This amount is based on a
$100.00 per front foot estimated cost. The actual amount
due to the City will be based on the actual cost when
constructed and the escrow account adjusted accordingly at
that time. This escrow will be required in lieu of the
construction of a half street.
Preliminary Water and Sewer plans - minimum 8" sanitary
sewer mains allowed per Sub-Division Ordinance or request a
variance.
Block A between lots 25 and 26, provide 15' sanitary sewer
easement· ~~__ ~__.~ 7} ?i:~__~_~,~ ~-
17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900
Please call if you have any questions.
Sincerely,
Kevin Psi f~'er,~J~.
CC:
Mike Daniel, P.E., NDM Consulting Engineers
File 88305