Shadow Woods/PP-CS 881104GINN, INC.
CONSULTING ENGINEERS
November 4, 1988
Taryon Bowman
City of Coppell
P.O. Box 478
Coppell, TX 75019
Re: Shadow Woods Estates Addition
Preliminary Plat, Water, Sewer and Drainage
DRC - Engineering
Dear Taryon:
We offer the following comments regarding the above referenced
preliminary plat, water, sewer and drainage plans.
32.5' wide right-of-way dedication required along Coppell
Road as per DeShazo, Starek & Tang's traffic study.
Prior to final platting, submit floodplain reclamation study
for review by the City's Floodplain Administrator, Mr.
Russell Doyle, P.E., and for submittal to FEMA for
Conditional Letter of Map Revision.
Add floodplain development permit note to the plat as per
the City's Comprehensive Floodplain Management Ordinance,
page 34.
At time of final platting, applicant shall be required to
submit an escrow of $87,070.00 for their one-half cost
obligation to Coppell Road. This amount is based on a
$100.00 per front foot estimated cost. The actual amount
due to the City will be based on the actual cost when
constructed and the escrow account adjusted accordingly at
that time. This escrow will be required in lieu of the
construction of a half street.
5. Preliminary Water and Sewer plans - no objections.
e
Per drainage plan, no open ditch drainage allowed along
Coppell Road or need to request a variance on the
preliminary plat.
Sincerely, ~
Kevin~eiffer, ~/~/~'I''~I
cc: File 88305
17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900