Shadowridge P4/PP-DR 881122COPPELL PUBLIC WORKS
M]~21~ORANDUM
November 22, 1988
TO:
FROM:
RE:
Taryon Bowman, Planning & Zoning 'Coordinator
Howard Pafford, Water Foreman ,
Preliminary Plat - Shadow l~idge'.:Estates 4th Increment
o
Would like to discuss the possibility of tieing the proposed water
line into the water line on Bro~ks.. Approximately 420 feet.
The sewer cleanout is set more than 200 feet from the manhole.
Why is the sewer proposed with the bend and at what degree does
it bend?
Show water valves on bydrants.
HLP/sm