Loading...
Shadowridge P3/FP-CS 881104GINN, INC. CONSULTING ENGINEERS November 4, 1988 Taryon Bowman City of Coppell P.O. Box 478 Coppell, TX 75019 Re: Shadowridge Estates, 3rd Increment Final Plat & Construction Plans DRC - Engineering Dear Taryon: We have no objections to the final plat and construction plans overall. A note does need to be added to the plat, however, regarding a floodplain development permit as required per the Comprehensive Floodplain Management Ordinance, Section C, paragraph 4, page 34. Also, based on the results of the traffic study by DeShazo, Starek & Tang, the right-of-way width for Coppell Road should be 65' total (32.5' each side). The final plat should be revised to reflect this. At the time of final platting, the applicant shall be required to escrow $56,891.00 for their one-half obligation to the paving and drainage improvements for Coppell Road along their frontage. This request shall be in lieu of a half street being constructed. The above escrow deposit is based on $100.00 per front foot construction cost. The actual cost due to the City will be computed upon completion of the roadway improvements and the account adjusted accordingly. Please call if you have any questions. Sincerely, ~ , Kevin Peiffgr,~ P.E. cc: File 88305 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900