Shadowridge P3/FP-CS 881104GINN, INC.
CONSULTING ENGINEERS
November 4, 1988
Taryon Bowman
City of Coppell
P.O. Box 478
Coppell, TX 75019
Re: Shadowridge Estates, 3rd Increment
Final Plat & Construction Plans
DRC - Engineering
Dear Taryon:
We have no objections to the final plat and construction plans
overall. A note does need to be added to the plat, however,
regarding a floodplain development permit as required per the
Comprehensive Floodplain Management Ordinance, Section C,
paragraph 4, page 34. Also, based on the results of the traffic
study by DeShazo, Starek & Tang, the right-of-way width for
Coppell Road should be 65' total (32.5' each side). The final
plat should be revised to reflect this.
At the time of final platting, the applicant shall be required to
escrow $56,891.00 for their one-half obligation to the paving and
drainage improvements for Coppell Road along their frontage.
This request shall be in lieu of a half street being constructed.
The above escrow deposit is based on $100.00 per front foot
construction cost. The actual cost due to the City will be
computed upon completion of the roadway improvements and the
account adjusted accordingly.
Please call if you have any questions.
Sincerely, ~ ,
Kevin Peiffgr,~ P.E.
cc: File 88305
17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900