Taco Bell/PP-DR 950928 (6)TUELECTRIC
Date 9-28-95
Comments for the City of Coppell
Development Review Committee
Preliminary/~m'l- Plat is ~aacceptable.
~/'~Easements will be required for proposed electric facilities.
A plat with easement requirements will be provided to the
developer.
~/Load information (size of structure, A/C / Heat Load) will
be required from the developer before easements can be
determined.
\/Other comments
Please call me at 214-888-1307 if you have any questions.
Tim Brancheau
14400 Josey Lane Farmers Branch, Texas 75234