Loading...
Taco Bell/PP-DR 950928 (6)TUELECTRIC Date 9-28-95 Comments for the City of Coppell Development Review Committee Preliminary/~m'l- Plat is ~aacceptable. ~/'~Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. ~/Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined. \/Other comments Please call me at 214-888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234