Loading...
Stonemead Est/Re-DR 950523 I 1 ~'~ELECTRIC Date Comments for the City of Coppell Development Review Committee Preliminary/Final Plat for Preliminary/Final Plat is not acceptable. Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined. Please call me at 214-888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234