StoneleighP2/PP,SP-DR 980326(5)~I~ELECTRIC
Comments for the City of Coppell
Development Review Committee
Preliminary~-Plat for
Date ~ "~_.ff-~ "Q'~
~/'Preliminary/Faa~l Plat is ~ acceptable.
k~r Easements will be required for proposed electric/gas facilities. A plat with
e~ement requirements will be provided to the developer.
b~Load information (size of structure, A/C, heat load) will be required from the
developer before easements can be determined.
Other comments
Please call me at 972/888-1307 if you have any questions.
Tim Brancheau
14400 Josey Lane Farmers Branch, Texas 75234