Town Center SC/PP-DR 960530DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: Town Center Shoreline Center. Preliminar~ Plat, Lot 1, Block 2, to
allow the development of a shopping center on 8.943 acres of properly
located at the northeast comer of Denton Tap and Sandy Lake Roads,
at the request of Dowdey, Anderson & Associates, Inc.(Applicant will
re-submit plans by Wednesday, April 24th, 1996)
DRC DATE: May $0, 1996 and June 6, 1996
CONTACT: Mike Martin, E.I.T., Assistant City Engineer 004-3679)
COMMENT STATUS: pot,,..~,..,--. ,~,~,.,~.,.~, o~, ,/'FINAL R~ggl'~gD
Preliminary Plat
1. Label the existing 10' water line easement with the volume and page number adjacent
to Denton Tap Road.
This is an informational comments only.
2. Impact fees required.
Site Plan
3. An easement is needed for the driveway radii off of Town Center Blvd. behind the
proposed retail building.
4. Note://8 needs to be removed from the site plan. All concrete paving shall conform
to the City of Coppell Subdivision Ordinance.
Preliminary Water & Sanitary Sewer & Storm Sewer Plans
5. Proposed meters on the south side need to be located outside the limits of the future
widening of Sandy Lake Road. Either locate the meter just inside the right-of-way or
in an easement.
Drainage Area Map
6. There needs to be discussion about the drainage areas shown. The drainage area map
provided does not match the drainage area map shown in the Spine Road plans.