Loading...
Town Center SC/PP-DR 960328 (5)~,~ELECTRIC Comments for the City of Coppell Development Review Committee Preliminary/{~m~ Plat for ~~ ~/%~7~/~ %~/~/m3~ Date ~ ~ --~ ~ ~_;fa~/--~/~ ~/Preliminary/~l Plat is~acceptable. ~/Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined. Other comments Please call me at 214-888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234