Loading...
Town Center L2/PP-DR 950523 l1 TU ELEC TR IC Date 5-23-95 Comments for the City of Coppell Development Review Committee Preliminary/~l Plat for ~ ~ /Preliminary/~ Plat is ~ acceptable. ~~aasements will be required for proposed electric facilities. A plat with easement requirements will be provided to the /~_ ~eloper. Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined. Other comments Please call me at 214-888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Fammrs Branch, Texas 75234