Loading...
Town C AddL2/MP-DR010628 (4) DEVELOPMENT REVIEW COM 1'lEE L ENGINEERING COMMEN IS ITEM: Town Center Addition, Lots 2 & 3, Block 3, Minor Plat, to allow the development of a retail/office center and bank on approximately 2.801 acres of property located along the east side of Denton Tap Road, approximately 325 feet south of Parkway Boulevard, at the request of Dowdey Anderson & Associates, Inc. DRC DA TE: June 28, 2001 and July 5, 2001 CONTACT: Kenneth M. Griffin, P.E., City Engineer (972-304-3679) COMMENT STATUS: ,,"PRELIMINARY F4NAt~ REVISED 1. As stated on the site plan, the location of the driveway to Denton Tap Rd. is unacceptable for Lot 3, therefore the fire lane should be revised accordingly. 2. Relocation of the driveway for Lot 2 onto Town Center Blvd. will also require that the fire lane be revised accordingly. 3. Should consider some type of cross access from Lot 2 to Lot 1, Block 3 on the east side to allow for greater circulation on site. 4. You are showing the discharge of drainage areas 4 and 5 into existing Town Center Blvd. That drainage needs to be picked up on site and taken to an existing storm drainage system.