Loading...
Town C AddL1/PP,SP-AG 971014(2)CITY COUNCIL AGENDA REQUEST FORM MEETING: October 14, 1997 ITEM ITEM CAPTION: Consider approval of Town Center Addition, Lot 1, Block 3, Preliminary Plat and Site Plan, to allow the development of a 24,620 square foot retail facility on a 2.54 acre tract of property located at the northeast corner of Denton Tap Road and Town Center Boulevard. SUBMITTED BY-' Gary L. Sieb TITLE: Director of Planning and Communi STAFF RECOMMENDS: Apprbval _X Denial STAFF COMMENTS: Date of P&Z Meetinq: September 18, 1997 Decision of P&Z Commission: Approved (7-0) with Cruse, Kittrell, Lowry, McCaffrey, DeFilippo and None opposed. Commissioners Redford, Stewart voting in favor. Preliminary Plat approval. Site Plan approval subject to the following recommended conditions: (1) (2) (3) (4) (5) (6) (7) Revision of the Landscape Plan to show either Leyland cypress or Austrian pine in place of eastern red cedar. If Austrian pine is chosen, the spacing shall be a minimum of 8 feet. Revision of the landscape plan to show the space to each side of the service doors on the east and north sides of the building, as well as the eastern end of the east-west wing, fully landscaped between the building and the parking lot curb. Landscaping shall consist of a sufficient number of plants capable of achieving heights in excess of 6 feet to provide a minimum of 20% coverage of the east building elevation, and 20% coverage of all that part of the north building elevation not on the property line. Landscaping of the eastern end of the east/west wing may be eliminated if the eastern end of that wing is redesigned to match the south and west elevations. Delineation of the location of electrical service meters on the building elevations, in inconspicuous groupings. Town Center Architectural Review Board approval of the building plans. The color of brick to be used will be the same or similar to that used on the Overton Bank. Provision of attached signs all of a uniform color and consisting only of channel letters in a shade of light grey, light brown, beige, cream or white. A logo/symbol could be shown consisting of the same material and color. Screening of all rooftop mechanical equipment so as not to be visible from any street. FIN. REVIEW :~ DIR. INITIALS.. ~¥ Agenda Request Form - Revised 1/97 CITY MANAGER REVIEW:~ Document Name tcl3ps.PZ CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE: TOWN CENTER ADDITION, LOT 1, BLOCK 3, PRELIMINARY PLAT AND SITE PLAN P & Z HEARING DATE: September 18, 1997 C.C. HEARING DATE: October 14, 1997 LOCATION: Northeast cgmer of Denton Tap Road and Town Center Boulevard. SIZE OF AREA: 2.54 acres; proposed 24,620 s.f. retail facility CURRENT ZONING: TC (Town Center) REQUEST: Development of a 24,620 square foot retail facility APPLICANT: Developer: Malouf Interests Inc. 5655 Sherry Lane, #1000 Dallas, TX 75225 (214) 369-4900 Architect: Dowdey, Anderson & Associates, Inc. 5225 Village Creek Dr., Ste. 200 Plano, TX 75093 (972) 931-0694 HISTORY: No platting history. TRANSPORTATION: Denton Tap Road is an improved six-lane divided thoroughfare (P6D) contained within a 100'-wide right-of-way. Town Center Boulevard is an access street with a variable right-of-way. SURROUNDING LAND USE & ZONING: North - South - East - West - vacant; "TC" Town Center Comerica Bank; "TC" Town Center Police & Courts Facility Addition; "TC" Sonic Restaurant; "C" Commercial Item # 7 COMPREHENSIVE PLAN: The Comprehensive Plan shows the property suitable for mixed uses. DISCUSSION: The Town Center District, from its inception in 1982, requires site plan approval by both the City Council and the Planning and Zoning Commission prior to issuance of a building permit. In evaluating the site plan proposed, one of the greatest concerns has been the building orientation. The service side faces Town Center Boulevard. Both Council and Commission should carefully consider this aspect of the plan, since it is physically possible to reorient the building with the service side facing north, away from the three street frontages. However, the applicant has taken steps to offset the adverse effects of the building orientation~ by placing landscape screening within the eastern portion of the property (although the eastern red cedar chosen is not on the current plant palette, and a change to that plant selection is recommended). The applicant has agreed to gang the electric service meters and place them in an inconspicuous location. In addition, the applicant has agreed to landscape the three islands in the center of Town Center Boulevard adjoining the property, to enhance the total site development. Another aspect of the site plan which requires correction or accommodation is the presence of only one loading space. For the past 18 years the Coppell Zoning Ordinance has always required two loading spaces of at least 12' by 30' each for a 24,000-square-foot retail building. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Planning staff recommends approval of the site plan subject to Engineering comments and the following conditions: 1) Revision of the landscape plan to show either Leyland cypress or Austrian pine in place of eastern red cedar. If Austrian pine is chosen, the spacing shall be a minimum of 8 feet. Revision of the landscape plan to show the space to each side of the service doors on the east and north sides of the building, as well as the eastern end of the east-west wing, fully landscaped between the building and the parking lot curb. Landscaping shall consist of a sufficient number of plants capable of achieving heights in excess of 6 feet to provide a minimum of 20 % coverage of the east building elevation, and 20% coverage of all that part of the north building elevation not on the property line. Item # 7 3) 4) 5) 6) 7) 8) 9) Provision of a landscape plan showing landscape development of the three median islands within Town Center Boulevard where it adjoins the property, as volunteered by the applicant. Delineation of the location of electrical service meters on the building elevations, in inconspicuous groupings. Unless the Board of Adjustment authorizes a variance, provision of 2 loading spaces each a minimum of 12 feet by 30 feet, as required by the TC District regulations. (This is not in any way intended to suggest that the Board of Adjustment would authorize a variance.) Town Center Architectural Review Board approval of the building plans. . Submission of a color board showing exterior building and sign material samples which comply with C.I.V.I.C. recommendations, for Planning and Zoning Commission approval prior to forwarding the site plan to City Council. Provision of attached signs all of a uniform color and consisting only of channel letters approved by the Planning and Zoning Commission and City Council. Screening of all rooftop mechanical equipment so as not to be visible from any street. ALTERNATIVES: Planning staff recommends approval of the preliminary plat, subject to Engineering comments. 1) 2) 3) 4) Recommend approval of the plat and/or site plan. Recommend disapproval of the plat and/or site plan. Recommend modification of the plat and/or site plan. Recommend approval of the plat, but take the site plan under advisement for reconsideration at a later date. ATTACHMENTS: 1) Preliminary Plat 2) Site Plan 3) Landscape Plan 4) Building Elevations 5) Departmental Comments 6) Applicant's letter dated September 8, 1997 Item # 7 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Town Center Addition, Lot 1, Block 3, Prelimina~ Plat and ~ to allow tl~ develop~,nt of a 24, 620 square foot reta~ facility on a 2.54 acre tract of property located at t~ nor~eaa corner of Denton Tap Road and Town ¢~nter Boulevard, at ti~ re, est of DRC DATE: Augtat 28, 1997 and September 4, 1997 CONTACT: kF~ Martin, P.K~ Assistmu City g~ineer ($04-$679) COMMENT STATUS: oo~ ~.r~r~ ov ~r~ · ~'REVISED AFTER P&Z No Comments. COPPELL, TEXAS 75019 P.O. Box 478 Coppell, Texas 75019 May 10, 2000 Mr. Matt Malouf Malouf Interest, Inc. 3811 Turtle Creek Blvd., Suite 1800 Dallas, TX 75219 RE: Landscaping at Eleanor's Square Dear Mr. Maloufi There have been several conversations between the City and you regarding the above-referenced subject over the last few weeks. The concern that continues to affect you and us is the replacement of dead landscaping and continued maintenance of the plant material. My understanding regarding your feeling - simply stated - is that the shrubs and trees died because of inadequate maintenance by the City. We denied those allegations and countered through citation that you never initially maintained the material, thus are still responsible for the plants. My purpose in writing you is to offer a potential solution to our impasse which I feel is equitable to all. In exchange for your providing appropriate landscaping material to replace the dead plants in the medians, the City will remove the dead material, plant and maintain the medians from planting date forward, and cease pursuing legal actions against you regarding this issue. The plant material in question, seven trees and numerous shrubs, is included on the attached sheet. These are the plant materials needing replanting. I believe this agreement will result in a fair resolution to these problems, with both sides giving a little to resolve this problem. Because we have begun legal action, we need to resolve this quickly. Please also understand that this is our final offer and anything less than this proposal will not be considered. I would appreciate a reply within two weeks of the date at the top of this correspondence, which would require your written response on or before May 24, 2000. If we have not heard from you by that date, we will resume legal proceedings. ~ I honestly feel this proposal works to the advantage of us both and look forward to an expeditious reply to our offer. Yol~r truly.~~' lim Witt City Manager Attachment T H B - (: ! T Y · O !r COPPELL PARKS AND LEISURE SERVICES DEPARTMENT INTEROFFICE MEMORANDUM Date: May 9, 2000 To: From: Re: Clay Phillips. Deputy City Manager Gary D. Sims, CLP, Director ~ Eleanor Square Landscape Plant Material Requirements Per your instructions, we have evaluated the condition of the plant material planted in the medians as part of the landscape requirements for the Eleanor Square Development. As we had indicated previously, a large number of the trees and shrubs are dead. We believe the following is an accurate representation of the plant material requiring replacement and the cost ofmaterlah for a bubbler irrigation system addition to ensure the thorough watering of the new trees. 7 Cedar Elm trees 3" caliper (~$200.00 ea. 60 Barberry Shribs (2 gallon size) ~_,$4.95 46 Juniper. (5 gallon size) ~$(6.95) 1,400..00 297.00 319.00 Materials and equipment cost ofa bubble~ system: 1. Piping, heads, remote valves, miscellaneous fittings, ~ -$1,500.00 2. Equipment Rental: a. (1) trencher ~ ~v @ S2so. 250.00 Grand Total $3,7769.00 MALOUF INTERESTS, INc. 38zz TtraTt~. C~tE~x BOUI,I~VA~D, SurrE 28oo DALLAS, T~-xas 752x9 2~4-2~9-49oo Fax 2~4-2~9-49ox NOV Z Igg8 November 23, 199:/ VIA FIRST CLASS MAIL Mr. Gary Seib Director of Planning City Planning Commission City of Coppell 255 Parkway Coppell, TX 75019 Re: Hinehley Property The undersigned owns certain property located at 230 N Denton Tap Road, Coppell, Texas, 75019 which at considerable effort and expense has been developed and improved/mo retail shopping space within Eleanor's Square Shopping Center. It has come to my attention that the owner of the property contiguous with and located immediately north of our property, is intending to construct certain retail improvements on his property. The owner is Glen I-Iinchley, Univest Properties, Inc., 12201 Merit Drive, Suite 170, Dallas, Texas 75251. This letter shall constitute a formal protest on behalf of the undersigned in connection with the proposed improvements on the adjacent property. It is my understanding that Mr. Hinchley intends to construct retail space on a zero lot line basis. The architecU~al and engineering renderings for Mr. Hinchley's property are based on plans and specifications owned by the undersigned and such plans were used without the consent of the undersigned. The construction of these improvements will cause severe damage to the architectural integrity of our structure and will have a diminishing affect on the overall appearance of the shopping center. Mr, Hinchley approached me many weeks ago regarding this issue and was informed at the time that there was no interest in allowing him to duplicate the look of Eleanor's Square, nor to attach his building to the existing structure. It is of great concern that it is now apparent he has chosen to proceed with this plan without informing me of his intentions to move forward or seeking permission. In addition to the severe damage to the architectural integrity of Eleanor's Square there are a number of other aesthetic and ethical considerations. I am available at any time to meet with you to discuss this matter. Mr. Gary Seib Page Two By this letter, I request that you give serious consideration to rejecting Mr. Hinchley's plans and building permit until such time as his proposed building has a reasonable set back from the property of the undersigned and is prepared with different architectural renderings so as not to adversely effect the overall appearance and value of our property and the shopping center. I am also respectfully requesting that I be notified of any public meeting regarding the consideration or approval of Mr. Hinchley's proposed development so that I may address these issues in the proper forum with the City of Coppell. Please feel free to call if you have any questions. cc: Mr. Harry Hargrave Architectural Control Committee COPPELL, TEXAS 75019 RO. Box 478 CoppelI, Texas 75019 972-462-0022 Mr. Matthew E. Malouf 5956 Sherry Lane Suite 1000 Dallas, Tx. 75225 September 5, 1997 Dear Matt: Based upon our conversation of this morning, I would like to expand upon the Planning Department's position relative to your proposed development in Coppell. We would like to support your request, but there are some troublesome issues that need resolution before we can advocate an approval position. Perhaps paramount among them is the lack of required landscaping on your site. As outlined in the DRC meeting of yesterday, there may be a means to addressing that issue as follows: -you have stated that an approximate 24,000 square foot building must be constructed on the site resulting in a shortage of required landscaping -there are three medians adjacent to your proposal that are in need of plant material which I would suggest you volunteer to landscape in lieu of providing all required landscaping on your development site. That way: -you will landscape an area that certainly adds to the aesthetic beauty of your site even if on city property, -such a proposal adds to the overall aesthetic quality of this area of Coppell, -by their close proximity to your site, it could be argued that by landscaping these medians, your overall on-site landscaping requirement might be reduced My suggestion is that you volunteer to landscape these medians; have Bill Leeming, your landscape architect, prepare quality landscape plans for the medians; agree to our typical landscape requirements which includes meeting the plant palette standards, provide irrigation to the area (the medians have conduit to the islands in place), agree to replace any material that dies in the first two years, etc., etc. Because the medians are on City property, we would be responsible for maintenance once the landscaping was established. I believe this summarizes our conversation. Please be advised that other concerns regarding this potential development relative to other city requirements would still have to be addressed. As I review your plans, the outstanding items--though not all--include signage, parking, making the rear of your building as attractive as possible, the loading space, and the other statements outlined in our earlier DRC correspondence. My hope is that these suggestions can be incorporated into your design and reflected in the development package to be submitted no later than noon, on Tuesday, September 9, 1997. ~~~ .tmly, Oebi~, A.I.C.P. ,f Planning and Community Services matt FO. Box 478 Coppell, Texas 75019 972-462-0022 October 15, 1997 Malouf Interests, Inc. 5655 Sherry Lane, #1000 Dallas, TX 75225 RE: Town Center Addition, Lot 1, Block 3, Preliminary_ Plat and Site Plan Dear Madam/Sir: This letter is to inform you that the Town Center Addition. Lot 1. Block 3. Preliminary. Plat and Site Plan, to allow the development of a 24,620 square foot retail facility on a 2.54 acre tract of property located at the northeast comer of Denton Tap Road and Town Center Boulevard were approved by the Coppell City Council on Tuesday, October 14, 1997. The Site Plan approval is subject to the following conditions: (1) Revision of the Landscape Plan to show either Leyland cypress or Austrian pine in place of eastern red cedar. If Austrian pine is chosen, the spacing shall be a minimum of 8 feet. (2) (3) Revision of the landscape plan to show the space to each side of the service doors on the east and north sides of the building, as well as the eastern end of the east-west wing, fully landscaped between the building and the parking lot curb. Landscaping shall consist of a sufficient number of plants capable of achieving heights in excess of 6 feet to provide a minimum of 20% coverage of the east building elevation, and 20 % coverage of all that part of the north building elevation not on the property line. Landscaping of the eastern end of the east/west wing may be eliminated if the eastern end of that wing is redesigned to match the south and west elevations. No photinia shrubs will be permitted. Delineation of the location of electrical service meters on the building elevations, in inconspicuous groupings. (4) Town Center Architectural Review Board approval of the building plans. (5) The color of brick to be used will be the same or similar to that used on the Overton Bank (Acme "Quorum"). (6) Provision of attached signs all of a uniform color and consisting only of channel letters in a shade of light gray, light brown, beige, cream or white. A logo/symbol could be shown consisting of the same material and color. (7) Screening of all rooftop mechanical equipment so as not to be visible from any street. Council did not grant the Planning and Zoning Commission Final Plat authority so when the Final Plat is submitted, a revised Landscape Plan showing the elimination of all photinia shrubs will also have to be resubmitted for approval. If you have any questions, please contact me at (972) 304-3675. Dir~tor Of Planning & Community Services cc: Bill Anderson, Dowdey, Anderson & Associates, Inc. Isabelle Moro, AICP, P&Z Coordinator Building Inspection F~ No. (214) FAX COVER SHF. ET PLEASE D£LrVER THE FOLLOWING PAGES TO: TRANSMrlTEDBY: ~= .~h~d~ IF YOU DO NOT RECEIVE ALL OF THE PAGL~= PI_.lJ_A~E CALL BACK AS SOON POSSIBLE. PLEASE DIAL DIRECT TO THE PERSON SENDING TiffS FAX BY DIALINC THE DIREc-r DIAL NUMBER LI~rED. THANK YOU. Development Review Committee Comments Planning Department Town Center Addition, Lot 1, Block 3, Preliminary Plat and Site Plan DRC Date: August 28, 1997 Planning & Zoning Commission Meeting: September 18, 1997 City Council Meeting: October 14, 1997 Site plan as shown will require (approximately): Building, front door access arcade and back door pavement (50 s.f./door) Perimeter landscaping, including driveway crossing (1,900 s.f.) Internal driveways Internal vehicular landscaping for driveways & driveway crossings Non-vehicular landscaping (15 % of 86,197) Parking spaces Internal vehicular landscaping for parking spaces 30,470 s.f. 16,550 s.f. 29,370 s.f. 3,127 s.f. 12,930 s.f. 16,700 s.f. 1,670 s.f. TOTAL: 110,817 s.f. This is enough area for 98 parking spaces. Therefore, the building may be occupied by up to 38% retail if 62% is occupied by business office uses. For this layout on this site, a 100% retail building cannot exceed 22,200 s.f. and meet landscape and parking requirements. If restaurant usage is a requirement, the recommended solution is to designate the site as the 2nd restaurant pad site mentioned in the second amendment to the contract of sale between The Parks of Coppell Trust and the City of Coppell. Note: A. Staff written comments will be faxed to each applicant. Please revise plats, landscape plans, and utility plans based on staff recommendations. Should applicant disagree with staff comments please provide reasons why staff recommendations should not be followed when you attend the Sept. 4th Development Review Committee (DRC) meeting. Each applicant will bring one new set of revised plats and plans to the Sept. 4th DRC meeting. Applicants will be asked to show, explain and defend any revision. An Engineer for the project or other representative is urged to attend the meeting. Applicant will have till noon Tuesday, Sept. 9th to resubmit twenty-eight (28) folded copies of revised plans and three (3) reduced paper copies (8 1/2 X 11) of each exhibit to the Planning Department. City of Coppell 59,56 , ~hm'~ .l~ne, .SaiU 1000 rz'~dlas. ~E~:x,., 75225 (214) 369-4900 I~, (2'14) 369- 5249 .Ol September 8, 190'/ VIA FACSIMILE (972) 304-3570 Mr. Gary Sieb Director of Planning and Community Services City of Coppell Box 478 Coppell, Texas 75019 Re: 7'own ('enter Development Dcar Gary: I am in receipt of your letter of'September 5, 1997. It should be made clear that one of your assumptions was misstated and should be corrocled herein. While I have stated that 24,000 square fe,~t must be built on the property, I have never agreed that it is short of landscaping and do not agree with the city's calculations. No one has ever been able to show that any othcr multi-tenant ce~tor in tile city of Coppcll has been required to do the amount of landscaping that is being required of my site. The desire by the city planners must be balanced by what is reasonable and aFFordable in a commercial project. Rent prices have a limit and those necessary to flu fl~is center are already at the high sidc. Any additional burdcns required by the city will make this project unfeasible. ! have consistently maintained that this center is a beautifid addition to the city and will be much better than another fast food joint. Somewhere, the planncrs must decide if sticking to an tmrcasonable approach is worth trading my center for a Whataburger. While ! am amenable to reaching a compromise, I cannot be picked apart on each and every wish of the committe, c. Therefore I make tho following proposal: I will "voluntarily' agree to landscape the three street islands pcr your "suggestion". I will make a good faith effort to hide all the utility motors by grouping tho~n. I will provide nice landscaping in an effort to "wall off" the back If possible, l will redesign U~e back to look more like the fiont, depending on who is the tenant for the east pan of the building. I will conform to city silage. Se~-08-97 02;57P P.02 Mr. Gary Sieb Page Two in exchange, the committee will recommend approval of the site plan as it, no more loading docks, no loss of'building size, no loss of parking, etc. I am allowed to use the fire hydrants fronting Denton Tap. Gary, you know well this is a good plan for this site and much preferred to the altomativcs. ~t is timc for the city to use some common sense. Please advise me of your decision.