Loading...
Town C AddL1/FP-DR 980326 (2)DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Town Center Addition. Lot 1. Block 3. Final Plat, to allow the development ora 26, 620 square foot retail building on approximately 3 acres of property, located at the northeast corner of Denton Tap Road and Town Center Drive, at the request of Dowdey, Anderson and Associates, Inc. DRC DATE: March 26, 1998 and April 2, 1998 CONTACT: Mike Martin, P.E., Assistant City Engineer (304-3679) COMMENT STATUS: ,,'PRELIMINARY A 1. Impact Fees will be req ed. 2. Provide utility plans. Site Plan Comments 1. Need to line up the proposed driveway into the east/west Town Center Blvd. with the existing median opening. 2. Show the 5' sidewalks on Denton Tap Road and the 4' sidewalk along Town Center Blvd. 3. Show the width of the proposed driveways. 4. A left turn lane on Denton Tap Road will need to be built for the proposed north driveway into this site.