Town C AddL1/FP-DR 980326 (5)Preliminary/Final Plat for
Date ~_~(.o ~
/ /
~ELECTRIC
Comments for the City of Coppell
Development Review Committee
/F~nal Plat is not acceptable.
L~Easements will be required for proposed electric/gas facilities. A plat with
easement requirements will be provided to the developer.
[~Load information (size of structure, A/C, heat load) will be required from the
developer before easements can be determined.
Other comments
Please call me at 972/888-1307 if you have any questions.
Tim Brancheau
14400 Josey Lane Farmers Branch, Texas 75234