Loading...
Valley Rch SS/PP-DR 950928 (5) Preliminary/ ~~Plat for Date ~'(~E LEC TR IC Comments for the City of Coppell Development Review Committee ~//Preliminary~ Plat is~acceptable. ~Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the ovel°per' ad information (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined. Othercomments Please call me at 214-888-1307 if you have any questions. Tim Brancheau 14400 $osey Lane Farmers Branch, Texas 75234